Last Updated | 10/17/2022 01:37 PM |
Project Title | Victor Steinbrueck Park Renovation |
Physical Address | View project details and contacts |
City, State (County) | Seattle, WA 98101 (King County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $7,357,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 125724, 2015213.03 A/E ESTIMATE: $4,572,000.00 For purposes of the Inclusion Plan, this is considered a Parks type of project with a Past Performance of 25% WMBE utilization rates based on completed projects Fencing, temporary tree, vegetation soil protection, sedimentation, and erosion control. Clearing and grubbing of vegetation, tree removal. Identification, location and protection of art, park elements, adjacent properties, utilities, piping, electrical, expansion joints and other elements to remain. Selective demolition of concrete paving, cementitious overlay, and waterproofing material over existing parking structure. Selective demolition and saw cutting of concrete curb, concrete slab concrete park elements, wood, and metal elements on grade and below grade. Selective demolition of water, sewer, electrical and drainage. Selective demolition of metal railing, metal gutter, metal pergola. Expansion joint work on both new and existing assemblies. Coordination and sequencing of utility work, concrete work, drain work, and cementitious overlay work with waterproofing. Cementitious overlay work on parking structure. Concrete walls, concrete curbs, concrete stairs, concrete paving, concrete infill, concrete bases both on structure and on grade. Surface preparation for and installation of specialty waterproofing over the existing parking structure. Surface preparation for and installation of specialty waterproofing at new and existing concrete per plans, details, and specifications. Irrigation, water and drain piping on/within structure and below grade. Trench drains within concrete structure and on grade. Electrical work to include conduit, boxes, fixtures lighting and connections. Concrete, steel and wood components for rails and furnishings. Steel handrail, guardrail, supports and fabrications. Grading, soil prep, irrigation, plantings, grass and plant establishment. New drinking fountain waste receptacles and park fixtures. Additive #1: Replacement of pergola Additive #2: Furnishings and interpretive elements Additive #3: Storage Closet Deadline for Contractor questions regarding this Department of Parks and Recreation project shall be submitted by close of business on Monday, May 18th, 2022, to the Department of Parks and Recreation project manager via shannon.glass@seattle.gov |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |