Similar Projects
Brewster-Douglas Housing Project Redevelopment
New Construction, Demolition - 79,000 SF
Design
$300,000,000 est. value
Detroit, MI 48201

Gull Lake Community Schools Storage and Maintenance Buildings
Post-Bid
Richland, MI 49083

Forest View Renovations
Renovation
Post-Bid
Cadillac, MI

Construction Management Services
Results
Ann Arbor, MI

Addition To The Richfield Early Learning Center
New Construction, Renovation - 13,086 SF
Results
Flint, MI 48500

Immanuel Lutheran Church and School
Renovation, Addition
Construction
$6,500,000 est. value
Warren, MI 48044

Academy of Warren Professional Construction Manager
New Construction, Renovation
Construction
$6,500,000 est. value
Warren, MI 48089

East Grand Rapids Public Schools Wealthy, Breton Downs and Lakeside Remodeling
Post-Bid
Grand Rapids, MI 49506

Kingston Schools - Bid Package 3
Results
Kingston, MI

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

Ford Career-Technical Center Addition and Remodeling Project
Renovation, Addition
Post-Bid
Westland, MI

Coldwater Community Schools - New 4 / 5 Elementary School
Results
Coldwater, MI

2019 Bond Renovations- Bid Package 1 - Crowley Center, Foote Elementary School, Mixter Institute, and Paun Elementary School
Renovation
Construction
Lincoln Park, MI

2018 Bond Projects, Oakwood Elementary Addition. Portland School District
Addition
Post-Bid
Portland, MI

Brookside Classroom Addition
Results
$1,800,000 to $2,300,000 est. value
Cassopolis, MI

Last Updated 06/17/2020 10:30 AM
Project Title

Hunt Elementary - Dibble Elementary School Renovation

Physical Address View project details and contacts
City, State (County) Jackson, MI 49202   (Jackson County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of existing media center converting it to the new welcome center with a secure vestibule. Once the new welcome center is complete the existing office will be demoed and turned into classrooms. An existing stairwell will have a new mechanical lift installed for ADA access along with mechanical and electrical upgrades within the school. Dibble Elementary School ~ Renovation of the existing office to create a new welcome center with a secure vestibule. Demo of the existing portable units and a new 6 classroom addition to be built in its place. Miscellaneous mechanical and electrical upgrades as well as added parking.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents