Similar Projects
Last Updated | 08/09/2022 05:33 PM |
Project Title | Water Main and Water Service Replacement |
Physical Address | View project details and contacts |
City, State (County) | Grand Rapids, MI 49503 (Kent County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,109,865 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Water Main and Water Service Replacement in Page Street, Lister Court, Plainfield Avenue and Public Easement (Ne) and Water Service Replacement in Carrier Street and to furnish all parts, labor, materials, supplies, equipment and other facilities and things necessary and proper for and incidental to the proper performance and completion of the work specified in the Contract Documents, including the drawings and specifications and as required by the City Manager and City Engineer to begin construction within seven (7) calendar days after a Contract is executed (unless otherwise indicated in the Special Specifications) and to complete the work by the date(s) listed, and for the unit prices stated in the Bid Form. Addenda, if any have been issued, are to be acknowledged on the form provided at the place where bids are received, and a signed copy attached to the bid. Phase 1 Substantial Completion: 30 calendar days from start of construction but no later than October 27, 2023 Phase 2 & 3 Substantial Completion: 63 calendar days from start of construction but no later than October 27, 2023 Phase 4 Substantial Completion: 98 calendar days from start of construction but no later than October 27, 2023 Final Completion Date: May 24, 2024 For this project, the City of Grand Rapids Prequalification of Bidders and Subcontractors is waived and replaced with a Contractor's Qualification Statement. Each bidder and subcontractor must be prepared to submit, within two calendar days after bid opening upon Owner's request, a Contractor's Qualification Statement that is included as part of Section 00110 of the Bid Proposal document for this project. Upload a copy of your bid bond. If read low, the original must be available for delivery within 48 hours I have electronically verified my bid bond above or provided a cashier's check prior to the bid deadline. A certified check or bid bond for a sum not less than five percent (5%) of the amount of the Bid will be required with each bid. No bid may be withdrawn for a period of 90 calendar days after the date and time for receiving bids. The City reserves the right to accept or reject any and all Bids; to reject the Bid of a Bidder who is not, in the opinion of the Engineer or City, in a position to perform the contract; to waive informalities, irregularities and technicalities; to reject any and all non-conforming, non-responsive, unbalanced [unreasonable unit price(s)] or conditional Bids; or to advertise for new Bids. The City also reserves the right to award the Contract in the City's best interest, and therefore, may select a Bidder other than the lowest. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |