Similar Projects
Bridge 00002 Repair by Replacement
Design
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

T. Rockland, CTH JJ, Manitowoc River Bridge
New Construction, Infrastructure
Bidding
WI

Clear Span Arched Bridge
New Construction, Infrastructure
Bidding
Hillpoint, WI 53937

Timber Bridge Deck
Post-Bid
WI

Snowmobile Bridge Replacement Brewery Ditch - Dane 17 Bridge
New Construction, Infrastructure
Post-Bid
New Glarus, WI 53574

CTH PF - US 12, Pine Creek Bridge
Results
WI

STH 130 - CTH G, Little Bear Creek Bridge
Results
WI

The Couture Apartments
New Construction
Construction
Milwaukee, WI 53202

Connors Creek ATV Trail Bridge Replacement
New Construction, Infrastructure
Bidding
$160,000 est. value
Winter, WI 54896

Cassville - Patch Grove, Structures
Results
Cassville, Patch Grove, WI 53806

Bridge Epoxy
Renovation, Term Contract
Bidding
WI

V. of Potosi, Brewery Hollow Road, Potosi Branch Bridge
Results
Potosi, WI 53820

Sth 56 - Cth i, Gault Hollow Creek Bridge, b-52-0280
New Construction, Infrastructure
Bidding
WI

T. Casco, Elm Road, Rio Creek Bridge
Results
Casco, WI 54205

T. Fence, Rock Creek Bridge, Rock Creek Road, FR 2383
New Construction, Infrastructure
Bidding
WI

Last Updated 03/14/2022 01:44 AM
Project Title

City of Portage, Portage Canal, Adams Street to CP Railway Bridge

Physical Address View project details and contacts
City, State (County) Portage, WI   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Non-Highway; 0.000 Miles; Excavation, Base, HMA Pavement, Asphaltic Surface, Curb and Gutter, Sidewalk, Storm Sewer, Street Lighting, Signs, and Retaining Walls. Excavation Common, 530 CY; Base Aggregate Dense, 827 Ton; Construction Staking, 8,766 LF; Construction Staking, 6 Each; Construction Staking, 2 LS; Conduit, 2,951 LF; Storm Sewer Pipe, 8 LF 12“, 27 LF 12“; Concrete Curb and Gutter, 74 LF; Concrete Sidewalk, 515 SF Asphaltic Surface, 10 Ton; HMA Pavement, 617 Ton; Tack Coat, 7 Gals; Signs, 6 SF; Wall Modular Block Mechanically Stabilized Earth, 1,774 SF.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents