Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Primary Filtration Phase I
Renovation
Bidding
$19,523,000 est. value
Rockford, IL 61109

Disc Filters Installation
New Construction
Bidding
$9,000,000 est. value
Hanover Park, Schaumburg, IL 60193

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

WWTF - 2020 Raw Sewage Pump Replacement
Results
Plainfield, IL 60544

Primary Clarifier Flights Replacement
Results
Geneva, IL 60134

Design-Build Digester Rehabilitation
Renovation
Bidding
Libertyville, IL 60048

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

Harvard WWTF Improvements - Phase 1A
Results
Harvard, IL 60033

D5 and D7 Lagoon Wastewater System Services
New Construction
Bidding
McLean, IL 61754

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

2018 WWTP Improvements
Results
Less than $4,710,000 est. value
Belvidere, IL 61008

2022 Sewer Treatment Plant Improvements
New Construction, Infrastructure
Bidding
Hurst, IL

Electric Motor Rehabilitation
Renovation
Post-Bid
$380,000 est. value
Chicago, IL

Last Updated 12/30/2021 12:45 PM
Project Title

Effluent Channel and Kickapoo Interceptor Control Structures

Physical Address View project details and contacts
City, State (County) Peoria, IL 61605   (Peoria County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Kickapoo Interceptor Flow Control Structure (Repair 8210) Construction Of a Cast-In-Place Reinforced Concrete Flow Control Structure Around The Existing 84" Rcp Kickapoo Interceptor Sewer Pipe. The Structure Will Include a Large Stainless Steel Slide Gate And Stop Log Channels, Motorized Actuator, And Area Lighting. Upon Completion Of The Structure, The Area Will Be Filled To Elevate It To Match The Existing Levee Height. Effluent Channel Control Structure (Repair 8211) Construction Of a Proposed Reinforced Concrete Effluent Channel Water Level Control Structure, With a Pair Of Type 316 Stainless Steel Slide Gates And Motorized Actuators. The Control Structure Will Include a Cantilever Walkway For Access To The Gates And Safety Railing. The Project Also Includes a Concrete Weir Between The First Flush Basin And The Effluent Channel, And Guardrail With Attached Sodium Hypochloride Header Pipe.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents