Similar Projects
Last Updated | 03/05/2020 10:55 AM |
Project Title | Green Mountain National Forest South Half Road Maintenance Services |
Physical Address | View project details and contacts |
City, State (County) | Rutland, VT 05701 (Rutland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall blade and properly shape the total roadbed width, including curve widening, turnarounds, turnouts, and parking areas that are part of the roadbed cross section, to produce a surface which is uniform, consistent to grade and has either a crowned cross slope or an unidirectional cross slope across the entire roadbed width as indicated by the character of the existing surface. Typically the roadbed shall be shaped so the crown is at the centerline with a uniform downward transverse cross slope of at least to 1/2 inch per foot towards each roadbed edge. Rounding of the crown at the road centerline and excessive cross slope shall be avoided. Unidirectional cross slope shall be the same slope rate as the crowned cross slope rate. The transition between crowned and unidirectional cross-sloped sections shall be smooth and uniform. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |