Similar Projects
FN1505-20 Furniture Components Installation Services
Post-Bid
Washington, DC

Cafeteria and Kitchen Equipment, Commercial (Formal)
Post-Bid
Annapolis, MD 21401

Battle Command Training Capability - Equipment Support (BCTC-ES) Competition
Results
$1,000,000 to $100,000,000 est. value

Fabric Structures with Related Materials and Services
Results

Cafeteria and Kitchen Equipment, Commercial
Term Contract
Post-Bid
Glen Burnie, MD 21060

Guest Chairs for the DJS Headquarters Building
Results
Baltimore, MD 21202

Heater Rental
Post-Bid
Curtis Bay, MD

CRCF BMF Equipment Replacement
Results
Hanover, MD 21076

Commercial Washer/Extractor
Post-Bid
Jessup, MD

61--Solar Panels for USNA
Results
Annapolis, MD 21402

Calibration and Repair Services for Laurus Systems Equipment
Term Contract
Post-Bid
Glen Burnie, MD

Scaffolding & Containment Services
Results
Curtis Bay, MD 21226

Atrium Crawler Lift
Post-Bid
Glen Burnie, MD

USCG Yard Baltimore Luffing Crane
Results
Curtis Bay, MD 21226

Maintenance and Repair of Warehouse Equipment
Post-Bid
Annapolis, MD

Reported 04/01/2022 12:00 AM
Project Title

Rack Repair and Installation for USCG Yard

Physical Address View project details and contacts
City, State (County) Curtis Bay, MD   (Anne Arundel County)
Category(s) Single Trades
Sub-Category(s) Equipment, Furnishings
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The government requires procurement of (28) new 20’ x 42” Teardrop Upright 3” x 3” 23k pounds capacity; for installation and reconfiguration of existing rack structure. Each rack designated by the ICP for reconfiguration shall support (3) shelf beams per rack with a weight bearing load capacity per beam of 5,000 pounds with load limit signs posted and clearly visible. Horizontal spacing between existing rack structures and vertical spacing of current beam shelf placement shall remain intact unless previously approved by the Contracting Officer. The Contractor is to setup materials and equipment necessary for the rack reconfiguration in loading bay directly infront of building 20. Materials and equipment shall only be moved through bay door. The Contractor shall dispose of, as scrap, all items or materials removed during the completion of the project that are not designated to be reinstalled, retained and/or shipped by the Contractor. All item/material disposals are in accordance with applicable Federal, state, and local regulations.

Details

Division 10 - Specialties, Storage Assemblies, Storage Racks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents