Similar Projects
Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Carbon Pump Station Reconstruction
Demolition, New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Irving, TX 75038

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

JFK Park Construction
Results
$2,395,000 est. value
Dallas, TX 75200

Snider Plaza Utility Replacement
Results
$5,300,000 to $6,000,000 est. value
University Park, TX

New Restroom and Concession Building at BMX Park
New Construction
Construction
DeSoto, TX 75115

Irving Mall Site Work
Renovation - 767,000 SF
Construction
Irving, TX 75062

Huntington Townhomes
Demolition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Richardson, TX 75080

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

City Jail Expansion and Upgrades - City of Carrollton
Addition, Demolition, Renovation, Infrastructure
Design
$2,400,000 CJ est. value
Carrollton, TX 75006

Butterfly Valves Parts and Actuators Repair Services
Term Contract
Post-Bid
Dallas, TX

Water and Wastewater Small Services Installations at Various Locations, Part 1, 2 and 3
Results
$10,557,637 est. value
TX

Rick Oden Park Phase 1B
New Construction
Construction
Garland, TX 75041

W W Bushman Elementary School - 2020 Bond - Dallas Independent School District
Renovation, Infrastructure
Pending Verification
$30,986,820 CJ est. value
Dallas, TX 75216

Last Updated 10/31/2022 01:32 PM
Project Title

Vitruvian Park Phase 9, Block 701 - Town of Addison

Physical Address View project details and contacts
City, State (County) Addison, TX 75001   (Dallas County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $841,230 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition and paving improvements, water and sewer improvements, street lighting, and landscape improvements for Vitruvian Park Phase 9, Block 701 (Townhomes). The project is included in the city's 2022-2026 capital improvement plan (CIP). As of October 31, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents