Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

500 South Surplus Siphon Vault Replacement
Results
Less than $244,438 est. value
Salt Lake City, UT 84104

Mountain Dell Outlet Rehabilitation - Control Valves Pre-Purchase
Post-Bid
Salt Lake City, UT 84115

Scenic Drive Upper Conduit Slipline Project
Results
Less than $695,500 est. value
Salt Lake City, UT 84104

Conductor Pipe for Stratigraphic Well
Post-Bid
Salt Lake City, UT

State Street Waterline Replacment
Results
Murray, UT 84107

4100 South Secondary Waterline Project
Post-Bid
Magna, UT 84044

Arnold Springs Improvements Project
Results
Less than $256,561 est. value
Herriman, UT 84096

Little Cottonwood Penstock Lining Repair
Post-Bid
Murray, UT 84107

Chavez Drive Pipe Lining Project
Results
$30,000 to $40,000 est. value
South Jordan, UT 84095

Secondary Water Meter Installation
Post-Bid
South Jordan, UT 84095

Last Updated 12/03/2019 11:22 AM
Project Title

2019 State Street Waterline Replacement

Physical Address View project details and contacts
City, State (County) Murray, UT 84107   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will involve the installation of about: 883 feet of 8” ductile iron pipe waterline in the shoulder of the West side of State Street from 4500 South to Edison Avenue; 1,393 feet of 8” ductile iron pipe waterline on the East side of State Street in the sidewalk to just North of Fireclay Avenue; 127 feet of 8” ductile iron pipe connecting the new waterline from the East side of State Street to the existing waterline on Fireclay Avenue on the West side; and 800 feet of 8” waterline from the new waterline on the East side of State street through the parking lot of Sherwin Williams then turns south through their back lot connecting to the water system of Cottonwood Coves development including a new meter box. The waterlines paralleling State Street on the East and West side will replace the existing waterlines in place, therefore the existing pipelines will have to be removed and disposed of. Because the lines will be replaced in place, the contractor will have to provide a temporary service plan to continually provide water for the customers along State Street during construction. Each of the projects also may include connecting existing or installing new water services on the new waterline, furnishing and installing fire hydrants and sampling stations, connection materials and miscellaneous appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents