Similar Projects
Page Hall Renovation
Renovation, Alteration - 30,000 SF
Design
Raleigh, NC 27695

Z2DA--Install Emergency Power for HVAC
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Durham, NC 27705

NCSU - HVAC Renovation Matsumoto Wing - Brooks Hall
Alteration
Post-Bid
$565,000 est. value
Raleigh, NC 27605

HVAC System Upgrade at the FAY ASR Facility
Results
$156,000 to $260,000 est. value
Raeford, NC 28376

Rooftop Air Handlers Replacement
Results
$362,139 est. value
Raleigh, NC 27604

Unc School Of The Arts Residence Hall HVAC Phase 2
Construction
Winston-Salem, NC

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Furnace
Alteration
Post-Bid
Raleigh, NC

Z2DZ--Renovate and Replace Pharmacy AHUs
Results
$1,000,000 to $5,000,000 est. value
Durham, NC 27705

Weatherization Assistance Services
Post-Bid

The Marbles Kids Museum Imax Theater Chillers Replacement
Results
Raleigh, NC 27601

Down East Partnership for Children
Term Contract
Post-Bid
Rocky Mount, NC 27801

Mechanical Equipment Replacement Group 4 - Buildings SJ ILC Renovations
Results
$1,089,489 est. value
Raleigh, NC 27603

Crown Boiler Retubing and Burner Upgrade
Infrastructure
Post-Bid
Fayetteville, NC 28306

Replacement of HVAC Unit for USCG Base Elizabeth City BLDG 100
Results
Elizabeth City, NC 27909

Last Updated 01/31/2023 02:38 PM
Project Title

Tucker Creek Middle School HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Havelock, NC 28532   (Craven County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,680,662 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Craven County School Board of Education reserves the unqualified right to reject any and all proposals. No Bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents