Similar Projects
Concrete Pipes
Infrastructure
Bidding

Lakeview/Highland Detention Ponds
Infrastructure
Bidding
Stow, OH

Jacking and Boring Services
Post-Bid

Muskingum River Parkway Lock & Dam Irrms
Renovation
Post-Bid
$13,400,000 est. value

Reventment Bags and Erosion Control Mats
Results

Culvert Invert Paving
Term Contract
Results

Statewide Dam Improvements
New Construction
Post-Bid
$24,800,000 est. value

Upper and Lower Lake Dam Rehabilitations Phase II
Results
Richfield, OH 44286

Culvert Cleanout Services
Infrastructure
Post-Bid
Akron, Ashland, Bowling Green, Chillicothe, Delaware, Garfield Heights, Jacksontown, Lebanon, Lima, Marietta, New Philadelphia, Sidney, OH

Our Lady of Guadalupe Detention Basin
Results
$605,000 est. value
Macedonia, OH 44056

Jacking and Boring Services
Infrastructure
Post-Bid

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Box Culverts
Infrastructure
Post-Bid

Concrete Pipes
Term Contract
Results

Concrete Pipes
Infrastructure
Post-Bid

Last Updated 03/15/2022 04:19 PM
Project Title

Barlow Community Center Dam Improvements

Physical Address View project details and contacts
City, State (County) Hudson, OH 44236   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $170,389,857
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements at two lakes (upper and lower) and dams. Improvements at the upper lake include excavation to provide additional storm water storage, upgrades to the existing dam’s emergency spillway and modifications to the dam’s primary outlet and auxiliary valve system. Upgrades to the lower lake include the construction of a new dam to be located within the footprint of the existing lake, dredging of a portion of the lower lake and modifications to the primary outlet and auxiliary valve system. Upon completion of the mass grading and dam improvement work, existing asphalt walking trails and disturbed grass areas will be restored, and new trees planted.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts