Similar Projects
Solution to Repair and Sustain Cooling Tower Structures
Renovation
Conception
$300,000 CJ est. value
Chouteau, OK 74337

Investor's Capital Building 5th Floor Demolition
Demolition, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Oklahoma City, OK 73102

Crack Sealing, Rejuvenation, Fog Sealing
Term Contract
Sub-Bidding
Guymon, OK 73942

Abatement Services 2022
Term Contract
Post-Bid
Woodward, OK

Multi-Year Blanket - Non-Emergency Environmental Services
Term Contract
Post-Bid
Vinita, OK

Nuisance Abatement
Alteration
Results
Lawton, OK

Optima Asbestos Abatement
Alteration
Results
$25,000 est. value
Hardesty, OK

Demolition of Old Police Station
Demolition, Infrastructure
Post-Bid
$12,000 CJ est. value
Lawton, OK 73501

Demolition Old Edmond Res-Maintenance Yard - Central Sign Shop
Demolition, Infrastructure
Results
$47,300 CJ est. value
Edmond, OK 73013

Asbestos Abatement and/or Demolition of Glancy Motel and Former Pop Hicks Restaurant
Demolition, Alteration
Post-Bid
$40,000 est. value
Clinton, OK 73601

Northeastern State University Lawn Sign
Infrastructure
Results
$184,481 CJ est. value
Tahlequah, OK 74464

Nuisance Abatement
Term Contract, Infrastructure
Post-Bid
$150,000 CJ est. value
Lawton, OK 73501

Purchase and Remove House at 2218 West 6th Avenue
Demolition, Infrastructure
Results
$3,000 CJ est. value
Stillwater, OK 74074

Gage 2022-23 Island Repair
Infrastructure
Post-Bid
$200,000 CJ est. value
Gage, OK 73843

Residence Demolition - 1825 Military Drive
Demolition, Infrastructure
Results
$20,000 CJ est. value
Claremore, OK 74017

Last Updated 02/15/2023 11:53 AM
Project Title

Demolition Services for Comanche Park Apartments

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74106   (Tulsa County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Housing Authority of the City of Tulsa (THA) and its subsidiary Affordable Housing Property Solutions, Inc. (AHPS), invites proposals for Comanche Park Demolition. The contractor shall furnish all work, services, materials, and related items necessary to complete the work specified. The work includes, but is not limited to, the following: 1. Contractor must follow all OSHA guidelines and Compliances. 2. Protecting all adjacent properties and natural features of areas to remain undamaged. 3. Demolishing and removing all posts and foundations, buildings, sheds, fences, structures, porches, walls, furnaces, water heaters on or underneath the ground. 4. Demolish and remove paved surfaces, curb, gutter, and site concrete unless otherwise noted on plans. 5. Disconnecting and capping utilities. 6. Removing all rubbish, junk, and trash from the site. 7. Providing all necessary licenses, permits and pay fees. 8. Preserving all operating utilities serving other buildings and properties and related appurtenances on site. 9. Providing security fencing and signage as needed. 10. Providing dust control. 11. Contractor must provide Owner a copy of all permits and licenses and have them posted onsite during the contract period. 12. Contractor must provide the number of employees working at site each day to Owner. 13. Demolishing and removing all structures above and below grade. 14. Backfill all underground areas exposed during demolition. 15. Leaving site free of all demolition refuse, trash and junk and grade smooth at completion. 16. Restoring to original grades and conditions all properties damages by any activity related to the work and taking adequate precautions to avoid settlements or cave-ins. 17. After back-filling has been completed and approved, apply 3 to 4 topsoil. The site does need to be graded and left in a presentable manner with proper long term dust control measures. The criteria for evaluating the Proposals will be based on the items set forth in the RFP. Selected Responses will be added to the list of qualified and procured contractors, based on the determination of Evaluation Committee, of the vendors that best meets the current needs and long-term goals of THA. The Office of Contracts reserves the right to reject any or all Responses. Any questions regarding the RFP can be directed to Tomas Neal, Procurement Coordinator at 918-581-5747 or tomas.neal@tulsahousing.org . CONTRACTOR(S) selected under this RFP will be qualified and procured to receive a Task Order(s) from THA to provide work within the scope of services over a five (5) year period subject to performance reviews.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents