Similar Projects
Federal Courthouse
New Construction - 123,000 SF
Design
$86,000,000 est. value
Huntsville, AL 35811

New Town Hall Complex
New Construction
Bidding
River Falls, AL

Bessemer Courthouse Elevator Modernization - Phase 2
Renovation
Bidding
Bessemer, AL 35020

Renovations to Taylor City Hall
Renovation
Post-Bid
Taylor, AL 36301

Bay Minette Second Floor Remodel
Renovation, Build-Out - 3,300 SF
Post-Bid
Bay Minette, AL

Presolicitation Notice for Design-Build Services for the New US Courthouse, Anniston, AL
New Construction - 63,000 SF
Results
Less than $33,994,679 est. value
Anniston, AL

City Hall PEP Office Renovations
Renovation
Results
Less than $172,292 est. value
Birmingham, AL 35203

Construction of the Courtroom Addition and Renovation - Shelby County Courthouse
Renovation, Addition
Construction
AL

T.K. Davis Justice Center Courtroom Finish-Out
Construction
Less than $2,127,700 est. value
Opelika, AL 36801

Renovations to the Old City School for Evergreen City Hall
Renovation
Post-Bid
Evergreen, AL 36401

Hoover City Hall 3rd Floor Renovations Project
Renovation
Results
Less than $2,000,000 est. value
Hoover, AL 35216

Phelps - Price Justice Center Building Renovations
Renovation
Construction
Less than $13,845,918 est. value
Montgomery, AL 36102

City Hall Renovations/Reroofing and Police Headquarters Reroofing
Renovation
Post-Bid
Tuscaloosa, AL

New Bibb County Courthouse Annex
Results
Less than $2,051,991 est. value
Centreville, AL

Design Build Bridging for New Huntsville US Federal Courthouse, Huntsville AL
New Construction - 123,106 SF
Post-Bid
$70,000,000 to $80,000,000 est. value
Huntsville, AL 35801

Last Updated 12/04/2019 04:13 PM
Project Title

Interior Build-Out of the Second Floor of the Baldwin County Satellite Courthouse

Physical Address View project details and contacts
City, State (County) Fairhope, AL 36532   (Baldwin County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of approximately 13,500 sf of existing, conditioned space that was constructed in anticipation of a future build-out. The existing space is currently unoccupied and little/no demolition is expected. Generally, the work will include the following items; New interior, non-load bearing partitions, Modification to existing duct work to accommodate new floor plan, Modifications to existing fire suppression systems to accommodate wall layout and required head coverage, installation of branch circuits for electrical systems, data conduit installation, installation of all interior finishes, installation of communicating doors and hardware, installation of solar film at existing west wall and interior painting/staining. At this time, it is not anticipated that any structural work will be required nor any work to the exterior of the existing facility.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Painting and Coating, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents