Similar Projects
Alleghany Road Distribution Center
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Corfu, NY 14036

Excelsior Energy Center
New Construction, Infrastructure
Design
$345,550,000 CJ est. value
Batavia, NY 14020

Alleghany Road Multi-Residential Development
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Corfu, NY 14036

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Provide Forensic Identification Unit and Additions - Electrical Work
Addition, Demolition, Infrastructure
Post-Bid
$9,000,000 CJ est. value
Batavia, NY 14020

STAMP On-Site Water and Crosby Road Reconstruction
Infrastructure
Results
NY

2020 Capital Improvement Project Contract 105: Site Work
Infrastructure
Results
$1,857,000 est. value
Alexander, NY

GC Phase 2 Water Supply Contract 3C and 3D: Golden Road Pump Station
Renovation
Construction
NY

Plug Power
New Construction, Infrastructure
Construction
$290,000,000 CJ est. value
Alabama, NY 14013

Ivy Village Senior Apartments
New Construction, Infrastructure - 105,935 SF
Pending Verification
$22,000,000 CJ est. value
Le Roy, NY 14482

Cider Solar Farm
New Construction, Infrastructure
Pending Verification
$550,000,000 CJ est. value
Elba, NY 14058

Roadway Improvements to NYS Route 63
Infrastructure
Design
$5,000,000 CJ est. value
Batavia, NY 14020

Town of Alexander Water District No. 6
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Alexander, NY 14005

Culvert Rehabilitations, Drainage Repairs and Miscellaneous Work
Infrastructure
Results
$2,167,958 CJ est. value
Batavia, NY 14020

Cider Solar Farm
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Oakfield, NY 14125

Last Updated 06/23/2023 01:05 PM
Project Title

West Main Street Road Force Main & Kings Plaza Pump Station Force Main Replacements

Physical Address View project details and contacts
City, State (County) Batavia, NY 14020   (Genesee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,750,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of upgrades to the Kings Plaza Pump Station including new submersible sewage pumps, interior piping, electrical upgrades, and metering upgrades. Improvements to the building structure and site are located in the Valu Home Centers Plaza off West Main Street Road (NYS Route 5) in the Town of Batavia. This project also includes the installation of a new 12-inch force main from the pump station to the City of Batavia collection system, and new 8-inch gravity sewer main and manholes. Also included is the installation of a new 6-inch force main along West Main Street Road (NYS Route 5). There is also a new metering manhole on Edgewood Drive as well as telemetry communications Bids will be received for 3 separate contracts as follows: Contract A - Kings Plaza Pump Station Upgrades - General Construction Contract B - Kings Plaza Pump Station Upgrades - Electrical Construction Contract C - West Main Street Road Force Main & Kings Plaza Pump Station Force Main Replacements - General Construction The Owner reserves the right to award Construction Contracts separately to 3 different Contractors or separately to the same Contractor. It is not a requirement to bid on all Contracts. Separate bonds will be required for each Contract if multiple Contracts are awarded to the same Contractor. Contract A: $450,000 Contract B: $250,000 Contract C: $1,050,000 Total: $1,750,000 Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Only Bidders receiving bid documents from the Issuing Office (electronic or printed) will be allowed to submit a bid to be considered for award. A pre-bid conference will NOT be held. Only written Requests For Information (RFI) will be accepted. RFI's will be accepted until 12:00 p.m. (Local Time) on June 16, 2023, at the office of the Engineer to the attention of Brandon Moore via email: BMoore@CPLteam.com. If necessary, an Addendum will be issued by 5:00 p.m. (Local Time) on June 20, 2023, from the office of the Engineer. Bid security shall be furnished in accordance with the Instructions to Bidders. Each bid must be accompanied by a certified bank check or bid bond from a domestic carrier licensed to do business in the State of New York in the amount of not less than five (5%) of the amount of the bid submitted. This project is partially funded by New York State Environmental Facilities Corporation (NYS EFC). Prospective bidders should review the requirements included in the contract documents. This project is partially funded under New York State Homes and Community Renewal, Community Development Program and is subject to the applicable clauses described in the Section 3 Policy Manual and other CDBG requirements included in the Contract Documents. Bidders on this work will be required to comply with the President's Executive Order Nos. 11,246 and 11,375 which prohibit discrimination in employmentregarding race, creed, color,sex, or national origin. The successful bidder must be an equal opportunity employer, must meet all appropriate State and Federal standards, and comply with all relevant governmental regulations. Statement of Non-Collusion: Bidders on the contract are required to execute a non-collusive bidding certificate pursuant to Section 103d of the General Municipal Law of the State of New York. Security for Faithful Performance: The successful bidder will be required to furnish Performance and Labor and Material Payment Bonds written by firms licensed to do business in New York State, each in the amount of one hundred percent (100%) of the contract amounts in accordance with the provisions of the Contract Documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents