Similar Projects
Miller Road Extension (West of Miller Crossing subdivision) - City of Republic
Infrastructure
Conception
Less than $500,000 est. value
Republic, MO 65738

Bailey Extension 2 - City of Republic
Infrastructure
Conception
Less than $300,000 est. value
Republic, MO 65738

SOFTBALL FIELD ARTIFICIAL PLAYING SURFACE AND FENCING
Infrastructure
Design
$300,000 CJ est. value
Kirksville, MO 63501

Holiday Inn Express - Summit Street / Kansas City
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Kansas City, MO 64118

Water Tank Rehab and Painting (500,000 Gallon Elevated Structure and 1,000,000 Gallon Ground Storage Unit)
Infrastructure
Bidding
$600,000 CJ est. value
Fulton, MO 65251

Resurface
Infrastructure
Bidding
$2,500,000 CJ est. value
Kearney, MO 64060

Repair Gravel Roadway Surfaces - Disaster 4435
Infrastructure
Post-Bid
Less than $1,097,717 est. value
Craig, MO

Repair Gravel Roadways - Disaster 4451
Infrastructure
Post-Bid
Less than $323,868 est. value
Craig, MO

Sitework Services
Term Contract
Results
Columbia, MO

2021 Road Repairs
Infrastructure
Results
Kearney, MO

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

Armour Boulevard Mixed-Use / Kansas City
New Construction, Infrastructure - 40,000 SF
Pending Verification
$100,000,000 CJ est. value
Kansas City, MO 64106

Holmes Road Retail
New Construction, Infrastructure - 25,320 SF
Pending Verification
$6,700,000 CJ est. value
Kansas City, MO 64145

Reconstruction of sidewalks and curbs - 390258 - City of Kansas City
Infrastructure
Conception
$580,000 CJ est. value
Kansas City, MO 64113

Last Updated 10/18/2022 08:06 AM
Project Title

Resurface

Physical Address View project details and contacts
City, State (County) Savannah, MO 64485   (Andrew County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J1S3324 Route Various ANDREW, BUCHANAN, DEKALB, GENTRY County. Resurface on Rte. 169 (DeKalb, Andrew and Buchanan County), Rte. 48 (Andrew and Gentry County), Rte. 59 (Buchanan County), Rte. 45 (Buchanan County), Rte. E (Andrew County) and Rte. CC (Gentry County), the total length of improvement being 50.427 miles. Range: 7.5M to 10M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - A06 - Resurface *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents