Similar Projects
Bike Lane/Sidewalk/Drainage Improvements/Milling and Resurfacing
Infrastructure
Bidding
FL

Terramar Park Multipurpose Fields and Parking Lot Expansion
Addition, Infrastructure
Bidding
Parkland, FL 33067

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

Parking Lot at Park Place
Infrastructure
Post-Bid
Oakland Park, FL 33334

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

Interchange/Modification/Bridge Widening/Drainage Improvements/Milling and Resurfacing
Results
Less than $26,400,000 est. value
FL

Dominos # 5082-2
Alteration
Construction
Plantation, FL 33324

Undergrounding of Overhead Utilities and Streetscape Beautification at SR A1A From Hollywood Boulevard to Sheridan Street
Infrastructure
Post-Bid
Hollywood, FL

Sealcoating and Re-Striping of Parking Lot Services for College Gardens
Results
Dania Beach, FL 33319

Asphalt Resealing and Restriping
Alteration
Post-Bid
Hollywood, FL 33024

Sealcoating, Re-Striping and Repairs of Parking Lot Services for Ocean Drive Estates
Results
Pompano Beach, FL 33319

Downtown Properties Redevelopment Project Phase One - Development
New Construction, Infrastructure
Post-Bid
Oakland Park, FL

Safety D/B Push Button for WWD Devices at Interstate Ramps
Results

Lakeview Drive Sidewalk Improvement for Safe Schools Route
Infrastructure
Post-Bid
Weston, FL 33326

Sidewalk and Drainage Maintenance and Repair
Term Contract
Results
$525,000 est. value
Fort Lauderdale, FL 33301

Last Updated 01/17/2022 09:42 AM
Project Title

MTC Courtyard Partial Brick Paver Replacement

Physical Address View project details and contacts
City, State (County) Miramar, FL 33025   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove and replace existing 2 ¾” x 8 1/8” x 2 3/8” tumbled brick pavers, color: Old Florida Blend, and install approximately 2,600 sq. ft. of new commercial hardened edge 2 ¾” x 8 1/8” x 2 3/8” untumbled brick pavers, color: Old Florida Blend. 2. Remove, clean, and re-install 650 sq. ft. of shell finish white color 12” x 12” x 2 3/8” tile border tile; and 3. Pressure clean, remove and replace the epoxy sand between the joints of 3,170 sq. ft. of brick pavers along the breezeway between the Town Center City Hall and Development buildings. The brick walkway and sidewalk run in the Miramar Town Center Courtyard is both functional and historic in nature. The sidewalks and walkways are constructed out of sand or gravel set, Old Florida Blend color tumbled brick pavers with a shell finish white color 12” x 12” x 2 3/8” tile border tile. The tumbled pavers have cracked edges and have settled and raised causing some of the brick paver areas to appear in a dilapidated condition.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Unit Paving, Brick Unit Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents