Similar Projects
248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

Biosolids Holding Tank - Phase 2 - WW042 - City of Naperville
Infrastructure
Conception
$1,500,000 CJ est. value
Naperville, IL 60564

Walmart Supercenter #4259-232 - Smart Bundle
Renovation - 100,266 SF
Design

Walmart Supercenter #3790-242 - SP
Renovation - 203,826 SF
Design
Lockport, IL 60441

DD's Discount Exterior Facade Renovation
Renovation
Post-Bid
Bolingbrook, IL 60440

Truck Travel Center
New Construction
Post-Bid
Peotone, IL 60468

Site Work
Infrastructure
Results
New Lenox, IL 60451

Dog Park Electronic Gate Improvements
Infrastructure
Results
$383,200 CJ est. value
Joliet, IL 60432

Walmart Supercenter #4529-234 - SPRB-R
Renovation
Construction
$1,566,756 est. value
New Lenox, IL 60451

Amigeaux's Restaurant
New Construction
Construction
Joliet, IL 60435

Smoothie King w/ Drive Thru
New Construction - 20,000 SF
Pending Verification
Joliet, IL 60435

Mixed Use Development
New Construction - 6,570 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Lockport, IL 60441

Quik Trip / Joliet
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Joliet, IL 60436

Dog Haus Restaurant
New Construction, Infrastructure - 651 SF
Design
$250,000 CJ est. value
Bolingbrook, IL 60490

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

Last Updated 03/09/2023 10:14 AM
Project Title

Bell Plaza Lot 8

Physical Address View project details and contacts
City, State (County) Homer Glen, IL 60491   (Will County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a multi-tenant building. As of March 9, 2023, this project is pending SUP approval. Information regarding the selection of a general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the second quarter 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 3,484 SF - 2,419 SF. 1,065 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents