Similar Projects
Reported | 06/23/2021 12:00 AM |
Project Title | Mechanical/Electrical/Plumbing Engineer |
Physical Address | View project details and contacts |
City, State (County) | Tampa, FL (Hillsborough County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Continuing professional services are required for the following discipline: Mechanical/Electrical/Plumbing Engineer, minimum of three (3), University of South Florida, with ability to serve all campuses and facilities, as required. Projects included in the scope of this agreement will be specific projects for renovations, alterations, new construction, and additions for University facilities that have an Mechanical/Electrical/Plumbing construction budget that does not exceed $4,000,000.00 and survey, design, or studies for which the fee for professional services does not exceed $500,000.00. Projects for University facilities may include Teaching, Research, Health, Academic, Administrative, Recreation and Residence Life Facilities, as well as Infrastructure and Utility projects. Continuing Service contracts for these projects provide that the Consultant will be available on an as-needed basis for a period of three (3) years. This selection is based upon Mechanical/Electrical/Plumbing Engineer services only. Other services (including architectural, structural, other specialty engineering, etc.) that may be required for specific projects shall be provided as part of basic services through the selected Mechanical/Electrical/Plumbing Engineer based upon project need. Use of USF Continuing Service Consultants by the selected Mechanical/Electrical/Plumbing Engineer shall be encouraged for other services if required. A Mechanical/Electrical/Plumbing Engineer receiving the award will not have an exclusive contract to perform services for these projects. The University may have additional continuing service professionals under contract during the same time period. Any new construction projects should have the ability to be USGBC LEED certified, to a minimum certification level of Silver, if required by the Owner and shall be included as part of basic services and will not be considered as an additional service. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |