Similar Projects
NASCAR Speedway Commerce Center Business Park / Lincoln
New Construction, Infrastructure - 3,000,000 SF
Conception
$640,000,000 CJ est. value
Lincoln, AL 35096

Wellborn Cabinet Expansion / Oxford
Demolition, New Construction, Infrastructure - 250,000 SF
Design
$17,000,000 CJ est. value
Lincoln, AL 35096

Sidewalk and Streetscape Improvements
Infrastructure
Bidding
$775,000 CJ est. value
Lincoln, AL 35096

Classroom Addition To Lincoln High School
Addition, Demolition, Infrastructure
Bidding
$700,000 CJ est. value
Lincoln, AL 35096

Heritage Hall Drainage Improvements
Infrastructure
Post-Bid
Talladega, AL

Demolition of Existing Pool Area and Site Development for New Splash Pad
Demolition, Infrastructure
Post-Bid
Sylacauga, AL 35150

East Street North Pocket Park
Infrastructure
Results
$700,000 CJ est. value
Talladega, AL 35160

Hickory Street Ditch Rehabilitation
Infrastructure
Results
$1,002,375 CJ est. value
Sylacauga, AL 35150

12" Water Transmission Main Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Waldo, AL 35160

Storm Drainage Project
Infrastructure
Post-Bid
Childersburg, AL

Priebes Mill Road Water Main Extension (nr)
Infrastructure
Post-Bid
$400,000 CJ est. value
Oxford, AL 36203

Addition and Renovations to Cafeteria at Salter Elementary School
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$480,000 CJ est. value
Talladega, AL 35160

Paving for Talladega County Central High School
Infrastructure
Post-Bid
$662,000 CJ est. value
Talladega, AL 35160

Stemley BPS Replacement and New 10" Water Main Project
Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Talladega, AL 35160

Sylacauga Drainage Improvements
Infrastructure
Post-Bid
$450,000 CJ est. value
Sylacauga, AL 35150

Last Updated 03/10/2023 11:07 AM
Project Title

Willman Road Culvert Replacement Project

Physical Address View project details and contacts
City, State (County) Talladega, AL 35160   (Talladega County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

All questions shall be received four (4) days before bid opening. Questions received within the last four (4) days prior to bid opening will not be answered. The Contract award, if made will be made to the low, responsive, responsible Bidder as determined by the Base Bid as evidenced by: (1) a completed Proposal Form in accordance with the Instructions to Bidders and in accordance with stipulations in other sections of the Contract Documents; (2) no apparent unbalanced pricing for performance of the items work, (3) no special conditions or qualifications made by the Bidder; (4) no alternative Bids or offerings for any items unless such alternative Bids or offerings are requested in the Technical Specifications. A Bid Bond in an amount of not less than five percent (5%) of the total amount Bid (not to exceed $10,000) must accompany each proposal. The payee of such bond shall be THE CITY OF TALLADEGA, ALABAMA. The Bid Bond shall bear the same date as set for the receipt of Bids. Bid Bond shall be signed by an agent authorized to do business in the State of Alabama. The attention of Bidders is called to the provisions of State Law governing General Contractors, as set forth in Sections 34-8-1 to 34-8-24, inclusive, Code of Alabama 1975, as amended; and Bidders shall be governed by said law insofar as it is applicable. It shall be illegal for the Owner to consider a Bid from anyone who is not properly licensed under such code provisions. The Owner will not consider any Bid unless the Bidder produces evidence that he is properly licensed. Neither will the Owner enter into a Contract with a foreign corporation that is not qualified under State Law to do business in the State in which the site of work is located. All questions regarding this bid should be forwarded to the City of Talladega Attention: Renae Blackburn, Purchasing Director. Email: rblackburn@talladega.com.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents