Similar Projects
Drill, Case and Complete Water Well | Lots 1,2,3,4 and S/2N/2 Sec 1-4N-13ECM
Infrastructure
Bidding
Oklahoma City, OK

Water Well Maintenance and Repairs as Needed
Alteration
Post-Bid
Oklahoma City, OK

Installation of Six (6) Groundwater Monitoring Wells
Results
OK

Rotary Pump Water and Sewer Department
Infrastructure
Results
Tulsa, OK

Hollis Water Well Improvements
Infrastructure
Results
Hollis, OK

2020 CDBG Reap Water System Improvements
Infrastructure
Results
$420,000 est. value
Kenefic, OK

Well Plugging
Results
Oklahoma City, OK

Well No. 7 Improvements
Infrastructure
Bidding
Miami, OK

Semi-Permanent Submersible Chopper Pump
Infrastructure
Post-Bid
Broken Arrow, OK 74012

Maintenance of Continuous Monitoring Potable Water System
Term Contract
Design
Oklahoma City, OK 73104

Water Well No. 6 Improvements
Infrastructure
Bidding
Hollis, OK 73550

Hangar 8 Chilled Water Pump Replacement for OCAT
Infrastructure
Results
$557,800 est. value
Oklahoma City, OK 73169

Lawton Groundwater Supply - Treatment Pilot
Results
$305,000 est. value
Lawton, OK 73501

Repair Well Pump
Term Contract
Post-Bid
El Reno, OK 73036

ODVA Replace Geothermal Pumps
Infrastructure
Results
$450,000 est. value
Norman, OK 73071

Reported 03/04/2022 12:00 AM
Project Title

Furnish & Install Two Submersible Water Well Pumps

Physical Address View project details and contacts
City, State (County) El Reno, OK 73036   (Canadian County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Provide 480 volt/3-phase electrical service from the (2) electrical meter(s) to two (2) separate well houses. Work also includes installing approximately 70' of buried electrical conduits for routing electrical service to buildings. B. Install electrical wiring and necessary appurtenances in two (2) separate well houses in order to replace the existing single-phase well pumps with 3-phase well pumps. C. Remove and discard of existing single-phase motor starters, electrical wiring, transfer switches, drop pipe and other components necessary to complete the work as specified. The existing submersible pumps are to be removed and given to the Tribes. D. Supply and install two (2) 3-phase submersible well pumps and two (2) variable frequency drives in two (2) existing wells. E. Connect newly installed well pumps to existing radio telemetry system. F. Coordinate a start-up of the new equipment ensuring proper operation of all work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents