Similar Projects
Wendell Place Apartments
New Construction
Conception
Wendell, NC

Zero Slater Road
New Construction - 137,500 SF
Conception
$10,000,000 CJ est. value
Morrisville, NC

Hampton Spring
New Construction
Design
Raleigh, NC

Capitol Boulevard Mixed Use
New Construction - 1,700,000 SF
Design
Raleigh, NC

US 70 Improvements from Havelock Bypass to east of SR 1110 (Thurman Road)
Infrastructure
Bidding
Raleigh, NC

Fire Station 26 & Keeter Training Center Paving Project
Infrastructure
Bidding
$80,000 CJ est. value
Raleigh, NC 27601

Airport Boulevard Sidewalk Project
Infrastructure
Post-Bid
$500,000 est. value
Morrisville, NC 27560

Request to Prequalify Vendors For Residential Asbestos Abatement Services
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Raleigh, NC 27603

Morrisville Carpenter Road Project
Results
Less than $6,004,429 est. value
Morrisville, NC 27560

Asphalt Patches and Pavement Repair
Results
Less than $303,037 est. value
Raleigh, NC 27604

Davis Drive Apartments
New Construction - 107,950 SF
Construction
$15,000,000 est. value
Morrisville, NC

Walnut Trace
New Construction
Construction
Raleigh, NC

Morrisville Town Center Core - Phase 1
New Construction
Pending Verification
Morrisville, NC 27560

Morrisville Town Center Core - Phase 1
New Construction
Pending Verification
Morrisville, NC 27560

Abbey Spring
New Construction
Conception
Apex, NC 27502

Last Updated 08/04/2022 09:03 AM
Project Title

The Pointe at Town Center

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27616   (Wake County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $174,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of 11, three story, affordable rate and four story, age restricted apartment buildings at 3900 Sumner Boulevard and 5405 Oak Forest Drive. As of August 4, 2022, this project is in design and working through the entitlements process with the City of Raleigh. Information regarding the method of general contractor selection has not been disclosed. A construction schedule is unavailable. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 1,273,770 SF - 3 Stories Above Grade, 636,885 SF Apartments, 444 Unit(s). 3 Stories Above Grade, 636,885 SF Parking Space/Stalls, 537 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents