Similar Projects
Last Updated | 05/13/2022 12:24 PM |
Project Title | North Water Treatment Plant (Nwtp) Lime Sludge Hauling, Removal, And Disposal |
Physical Address | View project details and contacts |
City, State (County) | Marco Island, FL 34145 (Collier County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of hauling, removing and performing final disposal of the lime sludge/cake from the North Water Treatment Plant (NWTP) facility located at 807 E. Elkcam Circle, Marco Island, FL 34145. This proposal shall be submitted with the contractor providing a disposal site. The sludge volume varies by the flow demands of the water treatment plant and is estimated to be approximately 27.5 cubic yards per day of low moisture lime sludge/cake. The estimated weight of the lime sludge/cake is approximately 1960 lbs. per cubic yard. Bidder must provide at least two trailers with a minimum of 27.5 cubic yard capacity per trailer for use at the plant. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |