Similar Projects
North Plant Replace CO2 Tank
Infrastructure
Bidding
$275,000 est. value
Hamilton, OH

Rehabilitation of Millville Elevated Storage Tank
Infrastructure
Bidding
$250,000 est. value
Hamilton, OH 45013

Mill Creek Metroparks Gasoline and Fuel Oil
Post-Bid
Canfield, OH

Chemical Inventory
Post-Bid
Bowling Green, OH 43402

SSO 700 STF Disinfection Improvements
Results
Less than $4,000,000 est. value
Cincinnati, OH

Compressed Natural Gas (CNG) Fueling System Services
Results
Less than $546,400 est. value
Columbus, OH 43215

General Aviation Fuel Facility
Post-Bid
$700,000 est. value
Versailles, OH 45380

Above Ground Fuel Storage Tank/ Equipment
Results
Riverside, OH 45204

Harrison County Airport - Fuel Farm Relocation
Post-Bid
Cadiz, OH

Renovation of the Fields Avenue Facility (Underground Storage Tank Removal)
Results
Less than $203,254 est. value
Columbus, OH 43215

DOW/OPS-Generator Fuel Tank Scrubbing
Infrastructure
Post-Bid
Columbus, OH

Fuel System Maintenance
Term Contract
Results
Cincinnati, OH 45202

Repair of Queensgate Fuel Piping and Pump Replacement
Infrastructure
Post-Bid
Cincinnati, OH 45214

Secondary Improvements, 1-44C Phase I
Results
Toledo, OH

Underground/Aboveground Storage Tanks
Results
Less than $144,640 est. value
Westerville, OH 43081

Reported 09/11/2021 12:00 AM
Project Title

Ground Aviation Fuel Facility Installation

Physical Address View project details and contacts
City, State (County) East Liverpool, OH 43920   (Columbiana County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

One (1) 5,000-gallon (nominal) capacity aboveground 100 low-lead (LL) aviation fuel storage tank. Any/all existing tank accessories and attachments associated to the 5,000-gallon (nominal) capacity aboveground 100 low-lead (LL) aviation fuel storage tank. Any/all required tank piping and connections. Any/all required electrical wiring and connections. Relocate existing Fuel Master self-serve refueling electronic credit card reading/recording system to be networked for credit card reading and key card reading. Any/all required electronic and communications interconnect wiring to fuel tanks/pumps. Any/all applicable tank and dispensing system leak monitoring and safety items. Any/all required electrical and/or communications disconnections and hook-ups related to the aircraft refueling facility. Any/all security and flood lighting disconnections and hook-ups related to the aircraft refueling facility. Coordination with fuel intended supplier for hookups and offloading of fuel to new tank. Permits, drawings and appropriate approvals from agencies having jurisdiction over the aircraft refueling facility. PE stamped drawings for permitting. Inspections and fees. Site preparation, AST concrete pad, bollards, drainage, conduit, etc. for tank/piping/accessories/dispensing system. Any/all required lifting and hauling equipment. Any and/or all incidentals not mentioned which are necessary to successfully install the above referenced tank, accessories and systems to provide an operable aboveground aircraft refueling facility.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents