Similar Projects
Portal North Bridge Project
Bidding
NJ

East 25th Street Pedestrian Bridge Replacement
Post-Bid
Bayonne, NJ 07002

Rt. 3 Bridge over Northern Secondary and Ramp a from Tonnelle Avenue (Route 1 and 9) to Route I-495
Results
$20,000,001 to $50,000,000 est. value
NJ

Supervision of Construction Services for Contract No. T100.465 Bridge Repairs and Resurfacing Milepost 92 to 122 and the Newark Bay-Hudson County Extension (2020)
Results
$16,000,000 est. value

PATH - Rehabilitation of Bridge Structures
Results
$1,000,000 to $5,000,000 est. value
Harrison, Newark, NJ

Drawbridge Preventive Maintenance
Results
$20,000,001 to $50,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Fender System Repairs and Pier E6; E7 and E8 Improvements Structure No. N2.01, Newark Bay Bridge
Results
$7,999,667 est. value
NJ

UHPC Overlay Research Project Contract A (North)
Results
Less than $5,000,000 est. value
Kearny, Montville, NJ 07032

Maintenance Movable Bridge and Tunnel Repair Contract
Results
$10,000,001 to $20,000,000 est. value

Maintenance Fire Preventive-Standpipe Passaic River Bridge Contract; Route 1 & 9T Mp 0.56 To 0.75
Results
Less than $5,000,000 est. value

Inspections, Maintenance, Testing and Repair of the Carbon Monoxide (“Co”) Monitoring Systems at the George Washington Bridge, and the Lincoln and Holland Tunnels
Results
Jersey City, NJ

Maintenance Orphan Bridge Repair Contract 2020-1, Various Locations, Statewide
Results
Less than $5,000,000 est. value

Last Updated 03/16/2021 02:46 PM
Project Title

Path - Replacement of the Hackensack Bridge Controls

Physical Address View project details and contacts
City, State (County) NJ   (Hudson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract consists generally of removal of existing relay- based electrical control system, control desk and instrumentation, thyristor motor drives, wound-rotor motors, and related components. Furnishing and installation of Programmable Logic Controller (PLC) system, control desk and instrumentation, variable frequency motor drives, inverter duty motors, fiber optic aerial droop cables, a bridge lightning protection system, and related work at PATH`s Hackensack River Vertical-Lift Bridge and the vicinity thereof in Hudson County, New Jersey.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents