Similar Projects
VCR Connector Trail - Salem Church/Harrison Roads - Spotsylvania County
Infrastructure
Conception
$380,000 est. value
Morristown, VT 05661

The Stowehof Expansion
New Construction, Infrastructure
Conception
$2,700,000 CJ est. value
Stowe, VT 05672

Winter Haus Townhouses
New Construction, Infrastructure
Design
$9,100,000 CJ est. value
Stowe, VT 05672

Winter Haus Townhouses
New Construction, Infrastructure
Design
$9,100,000 CJ est. value
Stowe, VT 05672

Greenway Path Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Cambridge, VT 05464

Crafco Pavement Repair, Equipment, Supplies, Parts, and Repair Services
Infrastructure
Post-Bid
Montpelier, VT

Boardwalk Construction
Addition, Infrastructure
Post-Bid
$100,000 est. value

Johnson-Morristown STP 2919 (1) and Morristown STP 2920 (1) and Johnson STP 030-2 (35)
Results
$10,000,000 to $25,000,000 est. value
Johnson, Morristown, VT

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

Mountain Road Hotel Expansion
New Construction, Infrastructure - 5,400 SF
Pending Verification
$1,600,000 CJ est. value
Stowe, VT 05672

Mountain Road Hotel Expansion
New Construction, Infrastructure - 5,400 SF
Pending Verification
$1,600,000 CJ est. value
Stowe, VT 05672

Mountain Road Multi-Use Building
New Construction, Infrastructure - 10,080 SF
Conception
$2,700,000 CJ est. value
Stowe, VT 05672

Central Drive Intermediate Care Facility
New Construction, Infrastructure - 4,000 SF
Design
$2,300,000 CJ est. value
Stowe, VT 05672

Clif Reynolds Road Culvert Replacement
Infrastructure
Post-Bid
$300,000 to $400,000 est. value
Cambridge, VT 05464

Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Results
$500,000 est. value

Last Updated 08/29/2022 10:07 AM
Project Title

Mountain Road Recreation Barn

Physical Address View project details and contacts
City, State (County) Stowe, VT 05672   (Lamoille County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2021
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 5, 2020 the project is in planning stage and seeking approval from the Town of Stowe Development Review Board. A meeting is scheduled for October 6, 2020. Information regarding the architect, general contractor and method of selection has not been disclosed. A construction timeline has not been determined, but is not expected to begin before the summer of 2021.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2,352 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents