Similar Projects
Spring Hill Sewer Separation and Streetscapes Phase 1
Infrastructure
Bidding
$22,982,000 est. value
Somerville, MA

Septic System for Town Hall
Infrastructure
Bidding
$70,000 est. value
Holliston, MA 01746

Catch Basin Cleaning
Post-Bid
Less than $40,000 est. value
Winchester, MA

Catch Basin Cleaning Services
Post-Bid
Burlington, MA

Phase 7 Sewer System Improvements
Results
$1,900,000 est. value
Lexington, MA 02420

Downtown Hudson Rotary Phase 2 - Sewer Cleaning and Lining
Results
$105,000 est. value
Hudson, MA 01749

Open Cut Repair of 352 l.f. of Sewer, Replacement of 13 Sewer Service Connections
Infrastructure
Bidding
$2,947,200 est. value
Watertown, MA

Supply Catch Basin and Manhole Frames, Grates and Covers
Post-Bid
Melrose, MA

CIP Project 7 Sewer Rehabilitations
Results
Less than $7,300,000 est. value
Newton, MA

Repair of an Existing Catch Basin in the Parking Lot at 6-8 Fairmont Street
Infrastructure
Bidding
$35,000 est. value
Cambridge, MA 02139

Water, Sewer and Drainage Replacement and Emergency Repairs
Post-Bid
Melrose, MA

Catch Basin Cleaning
Results
Less than $54,000 est. value
Tewksbury, MA 01876

Septic & Grease Trap Services at Ft Devens, MA
Post-Bid
Fort Devens, MA

Catch Basin Cleaning
Results
Less than $52,500 est. value
Tewksbury, MA 01876

Replace Approximately 100 Feet Underground Sewer Line
Post-Bid
Westford, MA

Reported 08/05/2021 12:00 AM
Project Title

On-Call Trenchless Utility Rehabilitation Projects

Physical Address View project details and contacts
City, State (County) Framingham, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 07/20/21
Owner View project details and contacts
Architect View project details and contacts
Description

Work will consist of scheduled and on-call trenchless services for the City of Framingham for various sewer and drainage and related utility projects. Rehabilitation methods will include: CCTV Inspection; Joint Testing and Grouting; CIPP Point Repairs; CIPP Pipe Lining; Lateral Reinstatement; Service Connection Sealing; Service Lateral Lining; Manhole Lining; Bypass Pumping; and Cleaning and Vactoring.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents