Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

Stay Open Hotel
New Construction, Renovation, Addition
Conception
San Diego, CA 92101

The Theatre House Mixed Use Development
New Construction
Design
San Diego, CA 92101

The Theatre House Mixed Use Development
New Construction
Design
San Diego, CA 92101

Mira Mesa Shopping Center
New Construction - 18,852 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
San Diego, CA 92126

San Diego International Airport Terminal 1
New Construction
Post-Bid
$2,265,000,000 est. value
San Diego, CA 92101

UCSD Theater District Living & Learning Neighborhood
New Construction - 900,000 SF
Construction
San Diego, CA 92037

Arena Califino
New Construction
Construction
$30,000,000 est. value
Oceanside, CA 92058

East Village Quarter Tailgate Park Mixed Use Development
New Construction
Pending Verification
San Diego, CA 92101

Costa Verde Center Mixed Use Center
New Construction, Renovation - 578,000 SF
Pending Verification
$10,000,000 CJ est. value
San Diego, CA

Pechanga Arena Redevelopment
New Construction, Renovation
Conception
San Diego, CA

601 West Beech Apartment Tower
New Construction
Design
San Diego, CA 92101

SuKarne Premium Meats
New Construction - 1,227 SF
Post-Bid
Less than $500,000 CJ est. value
El Cajon, CA 92021

Raising Cane's #520
New Construction - 3,267 SF
Construction
$500,000 to $1,000,000 CJ est. value
Chula Vista, CA 91910

Costa Azul Mixed Use Development
New Construction - 178,507 SF
Pending Verification
$10,000,000 CJ est. value
San Diego, CA

Reported 12/03/2021 02:54 PM
Project Title

Sunroad Hotel

Physical Address View project details and contacts
City, State (County) San Diego, CA 92101   (San Diego County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Hotel/Motel
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected fourth quarter 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Hotel/Motel, 15 Stories Above Grade, New Construction, 450 Unit(s), Food/Beverage Service, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents