Similar Projects
OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Nicollet Public Schools Mechanical Equipment - Supply
Post-Bid
Mankato, MN

Steam Boiler Replacement at MCF Red Wing
Results
Less than $1,963,759 est. value
Red Wing, MN 55066

JFK Elementary School 2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Chiller Maintenance
Post-Bid
Minneapolis, MN

2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Boiler Services
Term Contract
Post-Bid
Moorhead, MN

Owatonna 2021 Multi-site Mechanical Upgrades
Results
$900,000 est. value
Owatonna, MN 55060

Boiler and Chiller Replacement
Post-Bid
Woodbury, MN 55125

Valley View Elementary School Boiler Plant
Results
Columbia Heights, MN 55421

Furnace Upgrades & Air Quality Improvements
Post-Bid
Crookston, MN 56716

Repair Buildings 1 and 2 at MVH - Electrical and Mechanical
Results
Less than $230,000 est. value
Hastings, MN 55033

Furnish and Install Walk in Cooler and Freezer at Bureau of Criminal Apprehension
Term Contract
Post-Bid
$165,000 to $185,000 est. value
Saint Paul, MN 55106

Wentworth Library Boiler Replacements
Results
West Saint Paul, MN 55118

2021 Facility Upgrades BP1
Term Contract
Post-Bid
Cottonwood, MN

Last Updated 03/16/2022 02:51 PM
Project Title

FCI WASECA - PROPANE/AIR BACKUP FUEL SYSTEM COMPONENTS REPLACEMENT

Physical Address View project details and contacts
City, State (County) Waseca, MN 56093   (Waseca County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Propane/Air Backup Fuel System Components Replacement: provide all labor, materials, equipment to complete the Propane/Air Backup Fuel System Components Replacement project at FCI Waseca. - Requirements for this project will include but are not limited to; removal of existing equipment, installation of new propane pumps, installation of vaporizer blender system, installation of new gas piping and manifold, installation of new controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents