Similar Projects
Fellows Riverside Gardens Outdoor Education Building
Renovation - 825 SF
Bidding
$272,700 est. value
Youngstown, OH 44509

Paul Brown Stadium Press Box Renovation
Renovation
Bidding
$104,700 est. value
Cincinnati, OH 45202

Maumee Bay State Park - Exterior Cabin Renovations
Post-Bid
Maumee, OH

Pike Lake State Park - Cabin Renovations
Renovation - 900 SF
Post-Bid
Bainbridge, OH 45612

Ball Field Improvements
New Construction
Results
Less than $268,942 est. value
Georgetown, OH 45121

Camp Perry Concession
Results
Port Clinton, OH

Design-Build Services for LHSD Chieftan Center Field House
New Construction - 72,000 SF
Construction
$5,500,000 est. value
Logan, OH 43138

Objective Reality Games
Renovation - 1,000 SF
Construction
$1,200 est. value
Chillicothe, OH

New Mainline Toll Plaza Facility Utility Buildings, Toll Booths and Canopies Milepost 4
New Construction - 8,298 SF
Bidding
OH

Campground Improvements Phase 1
Post-Bid
$1,500,000 est. value
West Portsmouth, OH

New Ward 1 Recreation Center at Frederick Douglass Park
Results
Cleveland, OH 44114

Wick Recreation Area Maintenace Facility
New Construction - 13,500 SF
Construction
Less than $485,200 est. value
Canfield, OH 44406

City of Middleburg Heights Picnic Pavilions
Post-Bid
Less than $175,000 est. value
Middleburg Heights, OH 44130

Alum Creek State Park New Camp Store
New Construction - 1,200 SF
Results
Less than $361,400 est. value
Delaware, OH 43015

2019 Improvements Thurgood Marshall Recreation Center Architectural, Mechanical, Electrical and Plumbing Improvements
Post-Bid
Cleveland, OH 44106

Reported 01/07/2020 11:47 AM
Project Title

Neighborhood Revitalization Grant Projects

Physical Address View project details and contacts
City, State (County) North Baltimore, OH 45872   (Wood County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method
Project Status Construction Commenced third quarter 2019
Bids Due View project details and contacts
Estimated Value $84,589 to $144,536
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Grant Project could include public parking facilities with The Whistle Stop parking lot to be paved and landscaped, a splash pad area, a train viewing platform, thirty-five regular parking spots and two handicapped spots. The splash pad, a concrete base with a motion-detected water feature, would go near the north side of the lot and not the train tracks. The estimated cost for is this is $144,536. Park improvements are also being considered with six options in this category, ADA parking at the three concession stands and improving shelter house #1 with an estimated cost of $84,589.

Details

Misc. Recreational, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition, Selective Site Demolition, Paving Removal.
Division 13 - Special Construction.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents