Similar Projects
Buffumville Lake Electrical Upgrades, Charlton, MA
Design
$250,000 to $500,000 est. value
Charlton, MA

Electrical Upgrades, Birch Hill and Tully Lake Dams
Design
$250,000 to $500,000 est. value
Royalston, MA

Emergency Light Installation
Alteration
Bidding
$15,000 est. value
Leominster, MA 01453

Plumbing, Heating, and Mechanical Services
Term Contract, Alteration
Bidding
$130,000 est. value
Westborough, MA

Influent Screw Pump Replacement, Phase 1
Alteration
Sub-Bidding
$3,300,000 est. value
Clinton, MA 01510

Aegen Thermo Power 75LE Co-Gen Systems
Post-Bid
Less than $110,000 est. value
Worcester, MA 01605

Aegen Thermo Power 75Le Co-Gen Systems
Post-Bid
Less than $100,000 est. value
Worcester, MA 01605

Polar Park Downtown Ballpark - Filed Sub-Bid
Results
Worcester, MA

Polar Park Downtown Ballpark - Filed Sub-Bid
Results
Worcester, MA

Administration Building - Boiler Condensate System Repair
Alteration
Bidding
$49,700 est. value
Worcester, MA

Installation Gas Unit Heaters
Post-Bid
Fitchburg, MA 01420

Domestic Hot Water Heater Replacement Houghton School
Results
Less than $39,000 est. value
Sterling, MA 01564

Temporary Boiler at Crocker Elementary School
Alteration
Bidding
$95,000 est. value
Fitchburg, MA 01420

New Substation Step Voltage Regulators
Post-Bid
Holden, MA

SOU DAN Pod 1 Electrical Infrastructure, Dandeneau Hall - General Bids
Results
Less than $960,000 est. value
Shrewsbury, MA

Last Updated 08/05/2021 09:52 AM
Project Title

Delivery and Installation of Electrical, Mechanical

Physical Address View project details and contacts
City, State (County) Whitinsville, MA   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Electric, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000 to $60,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Delivery and installation of electrical, mechanical, and necessary materials to complete (from start to finish) one raw sewage pump with a variable speed motor rated for 1250 GPM at 44 feet TDH.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents