Similar Projects
New Riverside Park / Barn Site - 00085 - Town of Bluffton
Infrastructure
Conception
$3,872,112 CJ est. value
Bluffton, SC 29909

Buck Island Road Drainage Improvements - 00100 - Town of Bluffton
Infrastructure
Conception
$87,500 CJ est. value
Bluffton, SC 29910

Desai Hotel / Beaufort
New Construction, Infrastructure - 3,600 SF
Design
$30,000,000 est. value
Beaufort, SC

Desai Hotel / Beaufort
New Construction, Infrastructure - 3,600 SF
Design
$30,000,000 est. value
Beaufort, SC

P458 Laurel Bay Fire Station
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Beaufort, SC 29902

RFQ Engineering - Engineering and Consulting Services for Beaufort County Solid Waste and Recycling
Infrastructure
Bidding
$80,000 CJ est. value
Beaufort, SC 29902

Cross Island Parkway (US 278) Toll Conversion Design-Build Project
Post-Bid
SC

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Road Resurfacing Year 4 Projects - Asphalt Rejuvenator
Results
Beaufort, SC

Safety Improvements - US 278
Infrastructure
Results
SC

Pine Court Apartments
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
Beaufort, SC 29902

Pine Court Apartments
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
Beaufort, SC 29902

Washington Square East
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Bluffton, SC 29910

Washington Square East
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Bluffton, SC 29910

Spanish Wells Office Warehouse
New Construction, Infrastructure - 6,593 SF
Design
$800,000 CJ est. value
Hilton Head Island, SC 29926

Last Updated 11/10/2022 07:38 AM
Project Title

Reconstruction/Rehabilitation - District 6

Physical Address View project details and contacts
City, State (County) Beaufort, SC 29902   (Beaufort County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $13,576,661 [brand] Estimate
Plans Available from Civil Engineer - 10/11/22
Owner View project details and contacts
Architect View project details and contacts
Description

SC File NO(S).: 5663110 PCN: P041492 Project No.: P041492 PCN: P041499 Project No.: P041499 PCN: P041569 Project No.: P041569 PCN: P041572 Project No.: P041572 PCN: P041573 Project No.: P041573 PCN: P041574 Project No.: P041574 PCN: P041575 Project No.: P041575 Approx. Length (miles): 17.1600 CO(S).: : Beaufort Jasper The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. Only contractors who have been issued a prequalification certificate by the sc department of transportation will be allowed to submit bids. Information concerning prequalification can be obtained at the Contracts Administration office, Room 332 in the Headquarters building, 955 Park Street, Columbia, SC, or by contacting Maria Devito at (803)737-2043 or Prequal@scdot.org. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the Approximate bid amount, written by a surety satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized, the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. No other form of proposal guaranty will be accepted. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1249 with all Letting related questions. The south carolina department of transportation reserves the right to reject any or all proposals and waive any technicalities. SCDOT - 290 - Reconstruction/Rehabilitation - District 6 Plan holders desiring further information or interpretation of the Proposal or Plans shall make a written request for such information to SCDOT no later than Noon on October 26, 2022.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents