Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Bidding
Kaibito, AZ

GAOA Construction: Roosevelt Pavement Preservation
Term Contract
Bidding
Roosevelt, AZ 85545

Shinarump Penetrate and Chip Seal
Post-Bid
Kingman, AZ

Construction Manager at Risk Broadway Road (Phase 1) - Mesa Drive to Stapley Drive
Post-Bid
$25,000,000 to $30,000,000 est. value
Mesa, AZ 85210

North Garden Avenue and Fry Boulevard Improvements
Results
$2,200,000 to $2,400,000 est. value
Sierra Vista, AZ

Sun City Festival Ranch Planning Area 2 Parcel C2 Paving
Results
Buckeye, AZ 85326

Valencia East Extension
New Construction
Construction
$16,000,000 est. value
Tucson, AZ 85747

Jasper Parkway South
Infrastructure
Design
Prescott Valley, AZ 86314

System Preservation - Rest Area Rehabilitation
Infrastructure
Bidding
AZ

Route N128
Post-Bid
Shonto, AZ 86054

Haekel Road Cold Patch Asphalt 2019
Results
Safford, AZ

Central Mesa Reuse Pipeline - CMAR
Infrastructure
Bidding
$57,000,000 est. value
Mesa, AZ

Los Portales Del Alamo Roadway Paving Project
Post-Bid
San Luis, AZ 85349

Last Updated 07/27/2021 08:48 AM
Project Title

Noon Street Water and Paving Replacement

Physical Address View project details and contacts
City, State (County) Nogales, AZ 85621   (Santa Cruz County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $890,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Noon Street water line and paving project consists in the installation of 2,750 LF of 8”new PVC water main, 2 Fire Hydrants, 54 water services, 8 – 8” water valves and 6 – 6” water valves. The existing pavement will be removed and replaced with a new pavement cross section of 3” asphalt concrete over 4” aggregate base course. The project limits are from the intersection of MacNab and Noon Street to the intersection with Sonoita Avenue. The estimated pavement area is 11,145 Square Yards.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents