Similar Projects
Grayson Parking Lot
New Construction - 1,200 SF
Conception
Pittsburgh, PA 15219

Chatham University - Shadyside Campus - Connect Campus Character to 5th Avenue
Renovation
Design
Pittsburgh, PA 15232

Mount Pleasant Readiness Center - Rehabilitation of Roof and Parking Lot
Infrastructure, Alteration
Bidding
$400,000 to $500,000 est. value
Mount Pleasant, PA 15666

East Liberty Penn Circle - Two Way Conversion
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Pittsburgh, PA

College Avenue and Heister Street Sidewalk and Utility Upgrades
Renovation
Post-Bid
$662,219 est. value
University Park, PA 16802

2020 ADA Ramp Project -Borough of Heidelberg
Post-Bid
Heidelberg, PA 15106

KCAC Parking Lot Improvements
Results
$35,000 to $690,000 est. value
Indiana, PA 15705

2020 Penn Vale ADA Improvements Project
Results
Barbours, Williamsport, PA 17701

Meadia Heights Golf Course Pool and Restaurant
New Construction, Renovation - 1,800 SF
Construction
Lampeter, PA 17537

Ursinus College Main Street Pedestrian Improvements
New Construction
Construction
Collegeville, PA 19426

Center Street Pedestrian Connection and Gateway Project
Infrastructure
Bidding
$100,000 to $500,000 est. value
North Wales, PA 19454

Parking Lot Bituminous Repairs at the Expressway Travel Center (ETC) and Rochester Transportation Center (RTC)
Post-Bid
Aliquippa, PA 15001

Constructing Curb Cuts
Results
Huntingdon, PA 16652

Water Street Curb and Sidewalk Improvement Project
Infrastructure
Bidding
Windsor, PA 17366

SCTA Reading Operations Facility Sidewalk Replacement Project
Post-Bid
Reading, PA 19604

Reported 03/01/2022 12:00 AM
Project Title

Blair Center Concrete Patio Project

Physical Address View project details and contacts
City, State (County) Altoona, PA 16602   (Blair County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing shrubbery, sidewalk slabs, curbing and mulch. Stop curb removal at the street side of the Macy’s sidewalk. Remove damaged slabs adjacent to college wall and stair tower exit. Dispose of all waste material. Remove all shrubbery, mulch and tree from opposite planting area adjacent to the roadway and up to the existing electrical transformer. Saw cut and remove asphalt surface from a point in line with the sidewalk relief joint adjacent to college entry door on the parking garage side. Frame new patio area to provide smooth transitions from existing surfaces to new concrete area. Ensure base material is prepared using current industry standards Pour 4” minimum slab using 3000 PSI concrete. Reinforce with 6 x 6” reinforcing and control joints at a maximum of 6’0” x 6’0”. Create positive drainage away from the building. Brush finish final surface. Concrete must be sealed following installation Install bollards along side of new walkway to prevent traffic from entering the patio area from the asphalt parking surface. Install 2 additional bollard on walkway near intersection with mall roadway. After framing is removed, backfill side toward Macy’s with fine soil and plant grass seed. Cover seed with clean straw or tackified straw material. On parking garage side, plant perennial plants (TBD) and shrubs around transformer. Mulch entire surface to create a finished look.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents