Similar Projects
Boilers/Air Conditioning Units/Expansion Vessel Tanks/ Circulators - Preventive Maintenance, On-Call Repair Services and Emergency Services at Harrisonburg Men's CCAP Facility
Term Contract, Infrastructure, Alteration
Bidding
Harrisonburg, VA 22802

3Mbt Vent Fan Maintenance and Repair
Alteration
Bidding

General Electrical/Mechanical/Construction Services
Term Contract
Post-Bid
$279,675 est. value
Daleville, VA 24083

Boiler Chemistry Maintenance
Term Contract
Post-Bid
Bland, Burkeville, Craigsville, Dillwyn, Goochland, Jarratt, State Farm, Waverly, VA 23225

J--Boiler Plant Condensate Pump Repair
Results
Salem, VA 24153

Boiler Replacement Project
Results
Quantico, VA

Mechanical Preventative Maintenance
Term Contract
Bidding
Hampton, VA

John H. Kerr Floating Bulkhead Seals
Post-Bid
Boydton, VA

Jefferson Building Hot Water Systems Upgrades
Results
Less than $615,000 est. value
Richmond, VA 23219

Propane Boiler Replacement and Conversion
Alteration
Bidding
Ewing, Jonesville, Rose Hill, VA 24248

130 Ton Chiller - Re-solicit
Post-Bid
Richmond, VA

Clarifiers 5-8 Mechanism Replacement at Proctors Creek WWTP
Results
Less than $3,060,900 est. value
Chester, VA 23836

Whitcomb Boiler Replacement
Alteration
Bidding
Richmond, VA 23223

Ocean Lakes High School Boiler Plant Replacement
Post-Bid
Virginia Beach, VA 23454

Cooling Towers
Results
Richmond, VA

Last Updated 12/07/2021 08:57 AM
Project Title

Mechanical System Projects

Physical Address View project details and contacts
City, State (County) Stafford, VA   (Stafford County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Complete installation of variable air volume handling units serving existing buildings and removal of some or all of the existing units. Air handling units are typically chilled/ hot water and connect to the existing chilled/ hot water distribution system. 2. Ductwork and supply air devices connected to these units will sometimes be replaced to achieve proper air distribution. 3. Replace chillers serving the buildings. The chilled water pumps will sometimes be removed and modified for variable primary pumping. 4. Replace natural gas boilers serving the buildings and remove the existing systems. The hot water pumps will sometimes be removed and modified for variable primary pumping. 5. Replace the domestic water heaters, thermostatic mixing valves and recirculation pumps. 6. Refurbish existing hydraulic elevators and hoist ways. 7. Remove existing direct digital control (DDC) systems and install a modern electronic DDC Building Automation System to control both the new mechanical equipment and the existing-to-remain equipment. 8. Electrical work may include, but is not limited to, disconnecting the mechanical equipment to be demolished and connecting the new mechanical equipment.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents