Similar Projects
Last Updated | 04/24/2020 07:22 AM |
Project Title | Replacement of Bridge No. WB-456 at Milepost 54.95 |
Physical Address | View project details and contacts |
City, State (County) | PA (Allegheny County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provides for the furnishing of all labor, material, equipment and work necessary for the replacement of an existing single-span steel wide flange beam bridge over the PA Turnpike with a two-span curved steel plate girder bridge along with Center Road approach roadway realignment. The work also includes side road work on Old Frankstown Road (S.R. 2066), McKenzie Drive, Gateway Drive, and construction of driveway tie-ins. Work items include, but are not limited to: 26,912 CY Excavation, Various Classes 936 TON Superpave Asphalt Mixture, Wearing Course, Various Depths 2,234 TON Superpave Asphalt Mixture, Binder Course, Various Depths 3,226 TON Superpave Asphalt Mixture, Base Course, Various Depths 4,789 TON Subbase, (No. 2A), Various Depths 3,128 LF 6” Pavement Base Drain 1,535 LF Drainage Pipe, Various Sizes and Types 1,600 LF Guide Rail, Various Types 3,456 LF Barrier, Various Types and Sizes 919 SY Erosion Control Mulch Blanket 2,670 CY Cement Concrete, Various Classes 2,515 CY Foreign Borrow Excavation 360 CY Selected Borrow Excavation Rock, Type A 4,804 LF Piles, Various Sizes 453,671 LB Fabricated Structural Steel 16,400 SF Temporary Shoring 302,552 LB Reinforcement Bars, Epoxy Coated |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |