Similar Projects
SoHi Apartments
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Salt Lake City, UT 84101

SoHi Apartments
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Salt Lake City, UT 84101

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Deer Ridge Drive Reconstruction
Alteration
Post-Bid
$980,000 est. value
Draper, UT

Design Roadway Improvements
Results
Salt Lake City, UT

PCC Pavement Joint Seal Program North Cargo Apron Phase 2
Results
Less than $372,767 est. value
Salt Lake City, UT 84122

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Bueno Avenue Apartments
New Construction, Infrastructure
Pending Verification
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Pura Vita Senior Housing
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
West Jordan, UT 84088

City-Wide Roadway Improvement Project
Infrastructure
Post-Bid
Cottonwood Heights, UT

Micro Surfacing Project
Results
Holladay, UT

Dowland Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
South Salt Lake, UT 84115

At 2100 Apartments II
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Salt Lake City, UT 84115

Last Updated 09/13/2022 03:02 PM
Project Title

Airport Taxiways P, N, Q and H3 Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84122   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project will remove and replace 3 inches of asphalt pavement on the south half of Taxiway P, all of Taxiway Q and N, and Taxiway H3 to the runway hold short line. Taxiway shoulders will include a 1-inch asphalt overlay or a seal coat and crack repair to extend the life of the pavement. The project also will repaint airfield striping in the project area and upgrade the remaining quartz airfield light fixtures to LED in addition to removing and reinstalling existing LED lights in the project area to accommodate construction. You will be put on the list of recipients for that RFB or RFP and will be notified of any changes, corrections or addenda that occur Question Submission Close Date 4/21/2022 1:00 PM MDT

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents