Similar Projects
Domestic Hardwater Piping
Infrastructure
Sub-Bidding
$56,000 CJ est. value
Indianapolis, IN 46204

Plumbing, Mechanical, Electrical Work for the New Mt. Vernon Elementary School
Alteration
Post-Bid
Fortville, IN

Fawn River Crossing - Water Tower Coating System
Renovation
Post-Bid
$430,000 CJ est. value
Lagrange, IN 46761

Rehabilitation and Repainting of the Dubois Co. 4-H/Park Existing 200,000 Gallon Elevated Water Storage Tank
Infrastructure
Results
$135,200 CJ est. value
Saint Anthony, IN 47575

Wastewater System Improvements Division II - Repainting of Wastewater Treatment Plant Clarifiers and Miscellaneous Equipment - Rebid
Renovation
Results
$149,022 CJ est. value
Dale, IN 47523

Park Road and 200 West Water Main
Infrastructure
Construction
$371,319 CJ est. value
Greensburg, IN 47240

Hegewisch Burnham Diamonds
Term Contract
Post-Bid
South Bend, IN 46601

Water System Improvements Division II - Distribution Main Reinforcements Washington Township Water Corporation
Infrastructure
Results
$132,520 CJ est. value
New Washington, IN 47162

Levan Scott Academy Bid Phase 2: Architectural and MEP
Alteration
Post-Bid
$1,600,000 est. value
Fort Wayne, IN 46806

Kozuch Football Performance Complex Chilled Water Booster Pump Installation - 2022
Renovation
Results
$81,718 CJ est. value
West Lafayette, IN 47906

On Call Plumbing Repairs
Term Contract
Post-Bid
Evansville, IN 47710

County Road 700 North Sanitary Sewer
Infrastructure
Results
$4,883,000 CJ est. value
Brownsburg, IN 46112

Indianapolis Public Schools Building 56 Plumbing
Renovation
Post-Bid
$300,000 CJ est. value
Indianapolis, IN 46204

Water Utility Improvements Division "C" New Water Distribution System
Renovation, Infrastructure
Results
$19,902,651 CJ est. value
Eaton, IN 47338

Camp Atterbury Plumbing Fixtures Upgrade
Renovation
Post-Bid
$70,000 CJ est. value
Edinburgh, IN 46124

Last Updated 08/14/2023 10:06 AM
Project Title

WWTP & Lift Station Improvements Division A - North Lift Station and Force Main Improvements

Physical Address View project details and contacts
City, State (County) Upland, IN 46989   (Grant County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $28,696 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to the construction of a new triplex lift station and 12-inch force main; replacement of the existing generator and control panel; abandonment of the existing dry pit and force main; and all other work required for the complete construction of the new lift station to serve the Town of Upland. $150.00 - $350.00 Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution. The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The OWNER reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. NO bid may be withdrawn after the scheduled closing time for receipt of bids for at least 90 days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents