Similar Projects
Cole Grade Road - San Diego County
Alteration
Conception
$29,200,000 est. value
Valley Center, CA 92082

Leucadia Streetscape B and C Safety And Mobility - City of Encinitas
Infrastructure
Conception
$1,200,000 est. value
Encinitas, CA 92024

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Roadway Rehab to Mitigate Highway Settlement, Construct Aux Lane
Infrastructure
Design
$44,537,000 est. value
San Diego, CA 92124

FY21-22 Pavement Rehabilitation Overlay and Slurry Seal Project
Term Contract
Bidding
$1,025,000 est. value
Encinitas, CA

MLK Recreation Center Moisture Intrusion
Infrastructure, Alteration
Bidding
$916,000 est. value
San Diego, CA 92114

Parking Lot Seal And Stripe Services
Infrastructure
Post-Bid
$65,000 est. value
San Diego, CA 92117

Street Preventive Maintenance
Alteration
Post-Bid
$420,000 est. value
Coronado, CA

Slurry Seal Services
Infrastructure
Results
Vista, CA 92081

ADP Airside Improvements
New Construction, Renovation, Infrastructure, Alteration
Results
$270,000,000 est. value
San Diego, CA

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Slurry Seal Group 2222
Infrastructure
Bidding
$5,100,000 est. value
San Diego, CA

Minor B - Sb - Install Mgs
Infrastructure
Post-Bid
CA

Pershing Drive Bikeway Project
Infrastructure
Results
$12,980,675 est. value
San Diego, CA 92101

Butterfly Valves for Ramona Pipeline Valve Replacement - 5886410
Infrastructure
Design
$800,000 est. value
San Diego, CA 92101

Reported 07/18/2022 11:35 AM
Project Title

Lincoln Parkway Widening - City of Escondido

Physical Address View project details and contacts
City, State (County) Escondido, CA 92027   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025, Construction Completion Expected March 2027
Bids Due View project details and contacts
Estimated Value $3,013,110
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Escondido, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot. This project updates the Specific Alignment Plan and widens Lincoln Parkway/Avenue between Garrick Way and Fig Street. The project is expected to include medians, sidewalks, bike lanes, and improvements to the intersection at Lincoln/Fig. As of July 15, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents