Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Rehabilitation of Pump Station A
Renovation
Bidding
$1,307,300 est. value
North Miami, FL 33168

Braden Woods Lift Station Upgrade and New Force Main
Infrastructure
Bidding
$1,707,475 est. value
FL

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Lift Station, Grease Trap and Septic Tank Pump and Maintenance
Term Contract
Results
Less than $300,000 est. value
Viera, FL 32940

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Satellite Lift Station R and R Colony Cove 6 and Memphis Road
Infrastructure
Bidding
FL

Lift Station No. 38
New Construction
Post-Bid
$98,819 est. value
Melbourne, FL 32901

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Effluent Disposal Project
Construction
Chipley, FL

Dogwood Lane Pump Station Improvements
Renovation
Bidding
Orange Park, FL 32073

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Last Updated 08/30/2021 04:13 PM
Project Title

Mid-County Master Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Dunedin, FL 34698   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Construction Commenced October 2020, Construction Complete as of June 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the replacement of the Mid-County Wastewater Treatment Plant master lift station and associated gravity main and force main improvements. Questions End 3/27/2020 shelly.hughes@kimly-horn.com Shelby Hughes 727-498-2585 Engineer- Kimley Horn

Details

Lift and Pump Stations.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents