Similar Projects
Water Treatment Plant Upgrades Phase 2 - City of New Bedford
Renovation, Infrastructure
Conception
$16,012,500 CJ est. value
New Bedford, MA 02740

Replace Ozone System at the Russell F.Tennant Water Treatment Plant: Phase 1B, Construction - City of Attleboro
Renovation
Conception
$3,900,000 CJ est. value
Attleboro, MA 02703

RFQ Contractor - Quittacas WTP Phase 2 Upgrades Project - GC
Renovation
Bidding
$15,000,000 CJ est. value
East Freetown, MA 02717

Fall River Wastewater Treatment Facilities
Infrastructure
Bidding
$325,000 CJ est. value
Fall River, MA 02724

RFP Contractor - Raynham Center Water District PFAS Water Treatment Plants Prequalification - SUB
Renovation, Infrastructure
Sub-Bidding
Raynham, MA 02767

FY23 Waste Water Treatment Facility Sludge Removal Services
Term Contract
Post-Bid
North Attleboro, MA 02760

Furnishing and Installation of Photovoltaic System at the Somerset Water Treatment Facility - GC Bid
Renovation
Post-Bid
$1,500,000 CJ est. value
Somerset, MA 02726

Wastewater Treatment Plant Upgrades
Renovation
Results
$750,000 est. value
Easton, MA 02356

FY23 WasteWater Treatment Facility Primary Clarifier Grouting and Epoxy Coating Project
Infrastructure
Results
$304,840 CJ est. value
North Attleboro, MA 02760

Replace West Bed Sand Filters at the Wading River Water Treatment Plant - City of Attleboro
Renovation
Conception
$380,000 CJ est. value
Attleboro, MA 02703

RFP Contractor - Raynham Center Water District PFAS Water Treatment Plants Prequalification - GC
Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
Raynham, MA 02767

Wastewater Treatment Plant Upgrades
Renovation
Post-Bid
$750,000 CJ est. value
North Easton, MA 02356

Wastewater Treatment Facility Headworks HVAC System Improvements - General Bid
Renovation
Results
$1,085,000 CJ est. value
North Attleboro, MA 02763

Replace East Bed Sand Filters at the Wading River Water Treatment Plant - City of Attleboro
Renovation
Conception
$574,750 CJ est. value
Attleboro, MA 02703

Wastewater Treatment Facility Headworks HVAC System Improvements - Sub Bid
Renovation, Infrastructure
Post-Bid
$50,000 CJ est. value
North Attleboro, MA 02763

Last Updated 01/04/2024 05:08 AM
Project Title

Quittacas Water Treatment Plant Phase 2 Upgrades - Sub

Physical Address View project details and contacts
City, State (County) East Freetown, MA 02717   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000336630 The estimated project cost is $15,000,000.00. The City of New Bedford (City) acting through its Department of Public Infrastructure is soliciting quotes for the Glass and Glazing subtrade for our Quittacas Water Treatment Plant Phase II Upgrades . This quote solicitation is in accordance with M.G.L. c. 149, 44F(4)(a)(2). To submit quotes an interested vendor must have a North American Contractor Certification Program certification for Architectural Glass and Metal at the time of the quote opening and must employ glazing technicians certified under the Architectural Glass and Metal Technician program at the time of installation. Bid Intent Optional Bid Intent Deadline 01/02/2024 05:00 PM EST Question Acceptance Deadline 12/27/2023 04:00 PM EST Questions are submitted online Yes -- Questions and concerns can be directed to the New Bedford Purchasing Departments email at purchasing@newbedford-ma.gov. General Requirements - Certification/Training The Contract time shall be 730 calendar days commencing twenty days following the effective date of the . Job Location 1 Negus Way, East Freetown, MA 02717 Bid deposits may be in the form of Certified Check, Certificate of Deposit, or Bid Bond made payable to the City of New Bedford, Massachusetts. The Awarded Bidder must furnish a 100 percent (100%) Performance Bond and a 100 percent (100%) Payment Bond with a surety company acceptable to the City. *The City reserves the right to reject any and all Bids or parts thereof, to waive any irregularities or informalities in the Bids received, and to accept the Bid or parts thereof deemed to be in its best interest.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents