Similar Projects
ODOT SH 99 Waterline Relocation
Infrastructure
Bidding
Hominy, OK

Drainage Improvements at N County Line Road and NW 90th Street
Infrastructure
Bidding
$550,000 est. value
Oklahoma City, OK

Water Line Replacement
Post-Bid
McAlester, OK 74501

Operation, Maintenance and Repair Services
Term Contract
Post-Bid
Oklahoma City, OK

100-200 Block East Garriott Road Waterline Relocation
Results
Enid, OK

4800-5300 Blocks Venture Road Waterline Improvement
Results
$144,490 est. value
Enid, OK

Union Public Schools High School Water Damage Repair Phase 1
Infrastructure
Bidding
Tulsa, OK 74146

Section II - 72-Inch Water Transmission Main Improvements
Infrastructure
Post-Bid
$5,467,875 est. value
Oklahoma City, OK

1500-2500 Block of North Cleveland Street Waterline Relocation
Results
Enid, OK 73703

Waterline Replacement Northwest 4th Street and Shartel Avenue
Infrastructure
Post-Bid
Oklahoma City, OK

1000-1600 Block East Pine Avenue Waterline Relocation
Results
Enid, OK 73701

Sewer Force Main Improvements - HDPE Pipe and Plug Valve
Infrastructure
Post-Bid
Moore, OK

1600-1900 Block East Birch Avenue Water Line Relocation
Results
OK

Section A Waterline and Section B Stand Pipe Painting and Rehabilitation
Infrastructure
Post-Bid
Taft, OK

Choctaw 23rd Street Utility Extension
Infrastructure
Results
$615,000 est. value
Choctaw, OK

Reported 06/26/2021 12:00 AM
Project Title

W912bv21r0047-Presolicitation Notice (Sources Sought)- Bureau of Reclamation Waterline Relocation, Tinker AFB

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73145   (Oklahoma County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes design and construction of approximately 9,500 linear feet of raw waterline on Tinker AFB via open cut or bore including all appurtenances as shown in the plans and described in the specifications, construct connections to existing pipelines, hydrostatically test the pipeline and all appurtenances, remove or grout-in-place approximately of 6,800 linear feet of existing 21” and 24” water line, and incidental related work. The US Army Corps of Engineers is seeking to move a raw waterline to a new alignment. The existing waterline currently has an alignment that interferes with construction of other structures on the KC-46A campus. The existing line will remain in service until replacement pipeline is placed in service. Contractor shall verify site conditions independently. Option to design and replace approximately 450 linear feet of 24" raw waterline immediately to the West and East of the Tinker AFB boundary. This option is to connect the newly installed waterline on Tinker AFB with end points of waterline recently replaced by the Bureau of Reclamation outside of Tinker AFB boundary. This will ensure that no sections of "old" waterline remain in the system. For work outside of the secured perimeter(off-Base), the contractor shall still be required to follow guidance of TAFB when working in proximity to the secure area. All work off-base shall follow city guidance and any AHJ.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents