Similar Projects
Reported | 06/26/2021 12:00 AM |
Project Title | W912bv21r0047-Presolicitation Notice (Sources Sought)- Bureau of Reclamation Waterline Relocation, Tinker AFB |
Physical Address | View project details and contacts |
City, State (County) | Oklahoma City, OK 73145 (Oklahoma County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes design and construction of approximately 9,500 linear feet of raw waterline on Tinker AFB via open cut or bore including all appurtenances as shown in the plans and described in the specifications, construct connections to existing pipelines, hydrostatically test the pipeline and all appurtenances, remove or grout-in-place approximately of 6,800 linear feet of existing 21” and 24” water line, and incidental related work. The US Army Corps of Engineers is seeking to move a raw waterline to a new alignment. The existing waterline currently has an alignment that interferes with construction of other structures on the KC-46A campus. The existing line will remain in service until replacement pipeline is placed in service. Contractor shall verify site conditions independently. Option to design and replace approximately 450 linear feet of 24" raw waterline immediately to the West and East of the Tinker AFB boundary. This option is to connect the newly installed waterline on Tinker AFB with end points of waterline recently replaced by the Bureau of Reclamation outside of Tinker AFB boundary. This will ensure that no sections of "old" waterline remain in the system. For work outside of the secured perimeter(off-Base), the contractor shall still be required to follow guidance of TAFB when working in proximity to the secure area. All work off-base shall follow city guidance and any AHJ. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |