Similar Projects
Last Updated | 07/14/2021 08:27 AM |
Project Title | 75th Avenue Water Line: Cholla to Thunderbird |
Physical Address | View project details and contacts |
City, State (County) | Peoria, AZ 85383 (Maricopa County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is located in the City of Peoria. The limits of improvements include the North 75th Avenue corridor between West Cholla Street to West Thunderbird Road. The work consists of replacing the existing 8-inch and 12-inch waterlines primarily asbestos cement pipes (ACP) with a new 16-inch waterline. Work will also include several jack and bore operations at SRP Irrigation crossings. As part of the waterline improvements work, restorations will be required for the removal and replacement of pavement, curb, gutter, landscaping, signing, and pavement marking, as shown in the project plans and as required to fully restore existing improvements that will be impacted by the proposed waterline construction. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |