Last Updated | 10/04/2022 05:02 PM |
Project Title | Graff Main Hall HVAC System Renovation - University of Wisconsin/La Crosse |
Physical Address | View project details and contacts |
City, State (County) | La Crosse, WI 54601 (La Crosse County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $10,639,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | https://wisbuild.doa.state.wi.us/dfd/dfd_reports/selcom-agenda_past.asp 10. Graff Main Hall HVAC System Renovation UNIVERSITY OF WISCONSIN - LA CROSSE CAMPUS This project replaces all of the outdated, worn out, and under-performing equipment in Graff Main Hall and installs a new variable air volume system with reheat and variable-air-volume terminal units. Existing ductwork and equipment that is functionally adequate will be cleaned, repaired, and returned to service. The scope will include replacement of two air handling units and twelve existing exhaust fans with eight new exhaust fans; installation of a new central hot water heating system, new variable frequency drives, and motor starters; improvements in cooling for data and telecommunication rooms; and updated ventilation and controls. The following summary is the construction cost portion for the proposed scope of work. Selected Firm: Indoor Air Quality Diagnostics, Inc. - Wauwatosa _________________________________ As of March 12, 2021, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is expected to start in March 2023. *The closed solicitation has been included below for reference: This project replaces all of the outdated, worn out, and under-performing equipment in Graff Main Hall and installs a new variable air volume system with reheat and variable-air-volume terminal units. Existing ductwork and equipment that is functionally adequate will be cleaned, repaired, and returned to service. The scope will include replacement of two air handling units and twelve existing exhaust fans with eight new exhaust fans; installation of a new central hot water heating system, new variable frequency drives, and motor starters; improvements in cooling for data and telecommunication rooms; updated ventilation and controls; and sprinkler system retrofit through the facility. Project Schedule A/E Selection: Nov 2020 Design Report: Jan 2022 Approval: Mar 2022 Bid Date: Jan 2023 Start Project: Mar 2023 Substantial Completion: Dec 2024 Project Close Out: Jun 2025 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||