Similar Projects
Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Lee Street Lift Station Improvements
Renovation
Results

Lift Stations Backflow Preventative Maintenance Service
Renovation, Infrastructure
Post-Bid
Reserve, LA

Rock Island Greenway-hillcrest Connect
Infrastructure
Design
$500,000 CJ est. value
Dubach, LA 71235

Tanyard Creek Subdivision Phase II & III
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Ruston, LA 71270

LA 146 Bridges Near Kelleys
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Ruston, LA 71270

US 80: Lt Turn Ln at Nutmeg, LA 818 N and S
Infrastructure
Design
$2,500,000 CJ est. value
Ruston, LA 71270

Murphy Oil #5687/7857 / Ruston
Demolition, New Construction, Infrastructure - 2,800 SF
Design
$1,500,000 CJ est. value
Ruston, LA 71270

Wesley Chapel Water System Merger With Mt. Calm Water System
Infrastructure
Results
$1,273,878 CJ est. value
Ruston, LA 71270

Bonner St Bridge Ped Impr (Ruston)
Infrastructure
Design
$500,000 CJ est. value
Ruston, LA 71270

Water Production System Improvements, Water Well No. 6; Delta Regional Authority
Renovation, Infrastructure
Post-Bid
$921,816 CJ est. value
Simsboro, LA 71275

Water Production System Improvements, Water Well No. 6; Delta Regional Authority
Renovation, Infrastructure
Post-Bid
$921,816 CJ est. value
Simsboro, LA 71275

Buc-ee's / Ruston
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Ruston, LA 71270

I 20: LA 544 Overpass Replacement
Infrastructure
Design
$20,000,000 CJ est. value
Ruston, LA 71270

LA 823 : Drainage Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Dubach, LA 71235

Last Updated 03/13/2023 12:16 PM
Project Title

Water Production System Improvements, Water Well No. 6; Delta Regional Authority (Contract I)

Physical Address View project details and contacts
City, State (County) Simsboro, LA 71275   (Lincoln County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $483,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Deposits on the first set of documents furnished bona fide prime bidders will be fully refunded upon return of the documents in good condition no later than ten days after receipt of bids. On other sets of documents furnished to bidders the deposit less actual cost of reproduction, will be refunded upon return of the documents no later than ten days after receipt of bids. Any requests for bid documents will be accompanied by payment in full. No deposit is required for electronic sets. The Owner reserves the right to reject any and all bids for just cause; such actions will be in accordance with Title 38 of the Louisiana Revised Statutes. All bidders must sign: (1) the Bid, (2) Certificate of Corporate Principal and Surety, and (3) Bid Bond, which always must accompany the bid in the correct amount. A resolution authorizing a representative of the corporation/LLC/sole proprietorship to sign the bid must also accompany the bid. All addendums issued must be acknowledged by the bidder. No bidder may withdraw his bid within forty-five (45) days after the actual date of opening thereof. The Owner reserves the right to waive any informalities. All bidders must be registered with office of the engineer. Each bidder must deposit with his/her bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. Sureties used for obtaining bonds must appear as acceptable on the U.S. Department of Treasury Circular 570. This project is tax exempt. This project is not subject to American Iron & Steel provisions. The Contractor shall begin mobilization and procurement of materials within fifteen (15) working days of the receipt of the Notice to Proceed. Any person with disabilities requiring special accommodations under ADA requirements must contact the Owner no later than (7) days prior to bid opening. IN PARTICULAR, BIDDERS SHOULD NOTE THE REQUIRED ATTACHMENTS AND CERTIFICATIONS TO BE EXECUTED AND SUBMITTED WITH THE BID PROPOSAL. Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard for race, color, religion, sex or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents