Similar Projects
Hudson Heritage Plaza
New Construction, Renovation - 430,000 SF
Conception
$300,000,000 est. value
Poughkeepsie, NY 12601

YMCA Capital Improvements
Renovation, Addition
Conception
$5,920,000 est. value
Ithaca, NY 14850

Wyldwyck River Camp Eco-Lodging Facility
New Construction
Design
Saugerties, NY 12477

Holiday Inn Express
New Construction - 137,797 SF
Design
New Windsor, NY 12553

Purchase and Rehabilitation of City-Owned Property at 120 Grand Street
Renovation
Bidding
Newburgh, NY 12550

Municipal Pool Repairs
Bidding
Chateaugay, NY 12920

106 Room Marriott Courtyard
New Construction - 68,545 SF
Bidding by Invitation
$5,000,000 to $10,000,000 CJ est. value
Woodbury, NY 10917

Alexan Westchester
New Construction
Sub-Bidding
Harrison, NY 10604

High School Pool Project
Post-Bid
Less than $3,200,000 est. value
Corning, NY 14830

Woodstock Way Phase 2
New Construction
Post-Bid
$2,000,000 est. value
Woodstock, NY 12498

Whiteface Mountain Bear Den Lodge Phase 2 - Fire Sprinkler Pump Room
Term Contract
Results
Lake Placid, NY 12946

2016 Capital Project - Middle School Pool
Results
$1,000,000 to $2,000,000 est. value
Delmar, NY 12054

42 Broad Street West - Fleetwood
New Construction - 354,000 SF
Construction
$95,000,000 est. value
Mount Vernon, NY 10550

Holiday Inn Express
New Construction
Construction
New Rochelle, NY 10801

Rainbow Hospitality Dwelling Units
New Construction, Demolition
Pending Verification
Accord, NY 12404

Last Updated 01/03/2020 09:40 AM
Project Title

South Broadway Hotel

Physical Address View project details and contacts
City, State (County) Saratoga Springs, NY 12866   (Saratoga County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Hotel/Motel, Swimming Pool(s)
Contracting Method General Contractor to Subcontract.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, Hotel/Motel, 4 Stories Above Grade, New Construction, 120 Unit(s), 126 Parking Spaces, Swimming Pool(s).
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents