Similar Projects
Last Updated | 12/04/2018 11:34 AM |
Project Title | Three (3) Year Freshwater/Wastewater |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA (Philadelphia County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | THREE (3) YEAR FRESHWATER/WASTEWATER SYSTEM SERVICE CONTACT. - AQUA-PLUS 100/250 SYSTEM: (100 GALLON FRESH WATER TANK AND 250 GALLON WASTEWATER HOLDING TANK) - THE AQUA-PLUS SYSTEM CONSISTS OF A 100 GALLON FRESH WATER SUPPLY TANK, WITH PUMP AND ALL NECESSARY FITTING TO DELIVER THE WATER TO THE CUSTOMER'S 1.6 GALLON PER FLUSH COMMODE. ALL WASTE IS CAPTURED BY A HARIZONTAL LOW-PROFILE 250 GALLON SECURED HOLDING TANK LOCATED UNDER THE TRAILER (28" MINIMUM CLEARANCE REQUIRED) THE OUTSIDE DIMENSIONS OF THE TANK ARE 98"L X 54"W X 18"H WITH A 3" INLET AND A 4" OUTLET FOR WASTE REMOAL. * * *RENTAL OF SYSTEM/MAINTENANCE: AQUA-PLUS 100/250 SYSTEM INSTALLATION INCLUDES CONNECTING A 100 GALLON FRESH WATER TANK WITH A RECESSED PUMP TO A CUSTOMER SUPPLIED COMMODE AND/OR PORCELAIN SINK IN FIELD OFFICE TRAILER (IF APPLICABLE). A 250 GALLON WASTEWATER HOLDING TANK WILL BE INSTALLED UNDEREATH THE FIELD OFFICE TRAILER AND CONNECTED TO WASTE LINE AND SINK DRAIN LINE (IF APPLICABLE). WINTERIZATION OF THE 250 GALLON WASTEWATER HOLDING TANK IS INCLUDED WITH THE INSTALLATION, AND CONSISTS OF A HEAT PAD THAT IS GLUED TO THE EXTERIOR OF TANK. THE TANK IS THEN WRAPPED WITH AN INSULTED POLY BLANKET. THE WINTERIZATION PROCESS REQUIRES A 20 AMP; 110 VOLT ELECTRICAL CONNECTION FOR THE HEAT PAD. * *DELIVERY, SET UP AND ANY EXTRA FEE MUST BE INCLUDED INTO ONE PRECE (ONE TIME CHARGE) LOT 11/12/2018 1.0000 2 250 GALLOM WASTEWATER HOLDING TANK: RENTAL/SERVICE OF TANK: (INCLUDES ONCE PER WEEK SERVICE) * A 250 GALLON WASTEWATER HOLDING TANK WILL BE INSTALLED UNDERNEATH THE FIELD OFFICE TRAILER AND CONNECTED TO WASTE LINE AND SINK DRAIN LINE (IF APPLICABLE) WINTERIZATION OF THE 250 GALLON WASTEWATER HOLDING TANK IS INCLUDED WITH THE INSTALLATION, AND CONSISTS OF A HEAT PAD THAT IS GLUED TO THE EXTERIOR OF TANK. THE TANK IS THEN WRAPPED WITH AN INSULTED POLY BLANKET. THE WINTERIZATION PROCESS REQUIRES A 20 AMP; 110 VOLT ELECTRICAL FOR THE HEAT PAD. * *DELIVERY, SET UP AND ANY EXTRA FEE MUST BE INCLUDED INTO ONE PRECE (ONE TIME CHARGE) * LOCATION: SEPTA - YARDLEY SIGNAL MAINTAINERS TRAILER 7 READING AVE & S. MAIN ST. MORRISVILLE, PA. 19067 * PROJECT MANAGER: - JIM SCHNEIDER 610-308-4031 * SEPTA IS NOT BOUND TO SPEND ANY SPECIFIC AMOUNT. THIS PURCHASE ORDER SHALL TERMINATE UPON EXPIRATION OF THE CONTRACT PERIOD OR THE TOTAL DOLLAR CONTRACT AMOUNT HAS BEEN REACHED. LOT 11/12/2018 1.0000 | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |