Similar Projects
Well Pump Inspection and Repair
Infrastructure
Post-Bid
Collierville, TN

Repair of a 3 Stage Vertical Turbine Pump
Infrastructure
Post-Bid
Waverly, TN

2020 Rhea Co CDBG Clearwell
Results
$600,000 est. value
TN

Morton HSP Motor and VFD Replacement
Results
Memphis, TN 38128

Removal, Repair and Installation of Transfer Pumps
Infrastructure
Bidding
Crossville, TN 38572

Raw Water Intake Pump
Renovation
Results
Spring Hill, TN 37174

Submersible Pumps for the New Talbott Kansas Pump Station
Infrastructure
Post-Bid
Talbott, TN 37877

Rehabilitation of Spiral Lift Pump 204
Infrastructure
Post-Bid
Charleston, TN 37310

Rotating Assembly
Alteration
Post-Bid
Rogersville, TN 37857

Replace Methane Gas Vents
Alteration
Post-Bid
McMinnville, TN

2020 CDBG Imminent Threat for Ground Water Well Replacement
Results
$475,000 est. value
Sharon, TN

Raw Water Turbine Pump and Installation
Infrastructure
Post-Bid
Rogersville, TN

2021 Well Abandonment
Results
Memphis, TN

Grinder Pumps
Term Contract
Post-Bid
Crossville, TN

Straight Gravel Wall Well No. Five
Infrastructure
Post-Bid
$350,000 est. value
Gallaway, TN

Last Updated 10/08/2021 11:14 AM
Project Title

Water Well 4

Physical Address View project details and contacts
City, State (County) Atwood, TN   (Carroll County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of: 1. Drill a test well; 2. Provide test well information; 3. Drill a new well; 4. Finish the new well once all required testing is complete. Provide all casing materials, grout, screen and gravel pack, etc. 5. Install well pump, 25 HP motor, discharge piping and a few valves. Contractor is to disinfect the well and any of the piping installed by the contractor. 6. Owner will install the remaining valves and above ground piping and underground water main and connect to the existing water main. Owner will disinfect water piping. Owner will provide and install insulation for the above ground piping. 7. Site Work Improvements including a water line and minimal initial grading. The owner will provide the gravel access road, any fence changes, final grading and seeding; 8. Electrical Additions and Improvements, both inside the building and outside; and 9. The owner will provide any programming changes to their SCADA system 10. Any/All other work which could be considered incidental to completion of the project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents