Similar Projects
2022 Mechanical Systems Improvements At Jefferson & McKinley Elementary Schools
Renovation, Alteration
Bidding
Ottawa, IL 61350

Generator Maintenance
Term Contract
Post-Bid
Braceville, Byron, Clinton, Cordova, Marseilles, Mazon, Morris, Springfield, IL

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

DOC-Sheridan-Outdoor Chiller for C3
Results
Sheridan, IL 60551

Replace Original Generator, Chiller and Mechanical Systems
Renovation
Results
Less than $100,000 est. value
La Salle, IL 61301

HVAC and Mechanical Products
Term Contract
Post-Bid

Replace Original Generator, Chiller and Mechanical Systems
Renovation
Results
Less than $1,000,000 est. value
La Salle, IL 61301

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replace Original Generator, Chiller and Mechanical Systems
Renovation
Results
Less than $800,000 est. value
La Salle, IL 61301

Weatherization (IHWAP) Program
Term Contract
Post-Bid

Electric to Education Cabin
Alteration
Results
Oglesby, IL 61348

2022 Mechanical Systems Improvements - Pre-Purchase
Alteration
Post-Bid
Ottawa, IL 61350

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

2022 HVAC Improvements - 1935 Gym
Alteration
Post-Bid
Marseilles, IL 61341

HVAC Upgrades at Centennial Elementary School
Alteration
Results
Streator, IL 61364

Last Updated 01/17/2022 09:32 AM
Project Title

2022 Electrical and HVAC Upgrades at Milton Pope School

Physical Address View project details and contacts
City, State (County) Marseilles, IL 61341   (La Salle County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $950,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The work consists of replacement of the facility main electrical service to increase system capacity for new HVAC cooling system, that addition of an HVAC cooling system to the facility and conversion of steam boilers to hot water usage. Project scope is defined by the Contract Documents and includes, but is not limited to, the following: 1. Replace facility electrical service to increase system capacity for new HVAC cooling system. 2. Replace existing electrical panels due to age and lack of capacity. 3. Add electrical circuits and receptacles for additional power in existing classrooms. 4. Provide DX unit ventilators (heating and cooling) in classrooms/workrooms. 5. Provide ductless split air conditioning units in corridors. 6. Provide rooftop cooling/heating units in gymnasium. 7. Convert existing steam boilers to hot water usage. Provide new pumps and piping throughout building.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 32 - Exterior Improvements, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents