Similar Projects
Williamson RR OP
Infrastructure
Design
$1,400,000 est. value
Myrtle, WV

Huff Bridge
New Construction
Design
$2,000,000 est. value
Pine Grove, WV

Structure Replacement Fostoria Avenue Bridge
New Construction, Infrastructure
Bidding
$600,000 est. value
Marshall, VA - Moundsville, WV 26041

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Wheeling Suspension Bridge
Results
Wheeling, WV 26003

Cheat River Bridge
Results
WV

Meadow River Trail FEMA Remediation Project
New Construction, Infrastructure
Post-Bid
Lewisburg, WV

Bridge Deck Replacement
Results
WV

Re-Deck the Quick Community Lucy Lane Bridge
New Construction, Infrastructure
Post-Bid
WV

Monument Place BR
Results
WV

Bridge Deck Replacement
Renovation, Infrastructure
Post-Bid
$600,000 est. value
Charleston, WV 25330

Lindsey Bridge NB
Renovation
Results
WV

Beatrice Bridge
Results
WV

Robinson Run 1 Bridge
Results
WV

Last Updated 07/19/2022 09:56 AM
Project Title

Heath Creek Slab +2

Physical Address View project details and contacts
City, State (County) Barboursville, WV 25504   (Cabell County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $960,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, paving and new construction of a bridge / tunnel in Barboursville, West Virginia. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel. Federal Project Number : STP0010289D Type of Work : Replace Structure As of July 08, 2022, the project is in Final Planning status. The funding obligation date for the construction is April 28, 2022. WVDOT - Heath Creek Slab +2 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents