Similar Projects
Road Work - Adele Street Improvements TST
Infrastructure
Bidding
Charleston, SC 29407

On-Call Pavement Maintenance and Repair
Term Contract, Infrastructure
Post-Bid
James Island, SC

Road Work- Glenn Mcconnell Parkway Widening
Infrastructure
Post-Bid
SC

2020 Onyx Mastic Surface Treatment Plan TST
Results
North Charleston, SC 29405

Repair Airfield Parking Ramp Joint Base Charleston, SC
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Folly Road at Albermarle Road Improvements
Results
North Charleston, SC 29405

Shell House Road Paving
Results
North Charleston, SC 29405

Reconstruction/Rehabilitation - District 6
Results

Trolley Barn Parking Lot
Results
$450,000 to $600,000 est. value
Charleston, SC 29403

Rosebank Road Improvement Project
Results
North Charleston, SC

Safety Improvements I-20 - District 6
Results

Full Depth Patching-District 6
Results

Intersection Improvements - S-732
Results

FY20 Resurfacing North Charleston
Results
North Charleston, SC

Crack Seal - District 6
Term Contract
Results

Last Updated 11/18/2021 03:59 PM
Project Title

Intersection Improvements

Physical Address View project details and contacts
City, State (County) Mount Pleasant, SC   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,260,144
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of the construction of roadway improvements at the intersection of Coleman Boulevard, Patriots Point Road and Magrath Darby Boulevard in Mount Pleasant, South Carolina. Construction activities include, but are not limited to clearing, grading, asphalt paving, storm drainage, mast arm traffic signals, sidewalk construction and landscaping. Also included in the work is utility relocations (water line relocation and grinder pump relocation), traffic control, erosion control and pavement markings. The total length of the project is 0.220 miles of main road and 0.222 miles of sideroads for a total of 0.442 miles. There will be a six-month utility relocation window included in the contract time to allow private utility companies to complete the relocation of their facilities prior to the initiation of work under the contract.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents